5.2 Daily Inspection
● Before starting work, inspect the following items and verify that there are no
abnormalities. Operating this device without performing the inspection or without
removing the abnormal condition may cause death or serious injury.
■
Checklist (daily inspection)
Check
column
Inspection item
□
The switch body and the actuator are mounted according to the mounting and wiring
specifications and the door and other structures where they are mounted are installed according
to the installation conditions.
□
The door is not deformed or warped.
□
Check each door to confirm that the machine stops when the door opens.
□
There is no change in the installation environment that may affect the results of the risk
assessment performed before this device was installed.
□
If seal was applied to the mounting screw, the seal must remain unchanged.
□
There is no scratch, dirt, or damage in this device.
□
There is no scratch, bent, or damage in the wiring.
5.2 Daily Inspection
WUME-SGPUM-2
5-3
Содержание SG-P Series
Страница 2: ... MEMO 2 WUME SGPUM 2 ...
Страница 4: ... MEMO iv WUME SGPUM 2 ...
Страница 16: ... MEMO 1 10 WUME SGPUM 2 ...
Страница 31: ... Actuator 3 1 Installation Conditions WUME SGPUM 2 3 5 ...
Страница 40: ... MEMO 3 14 WUME SGPUM 2 ...
Страница 54: ... MEMO 5 6 WUME SGPUM 2 ...
Страница 55: ...6 Troubleshooting 6 1 Troubleshooting 6 2 WUME SGPUM 2 6 1 ...
Страница 65: ...7 2 Dimensions WUME SGPUM 2 7 7 ...
Страница 67: ...7 2 Dimensions WUME SGPUM 2 7 9 ...
Страница 68: ...7 2 3 I O Circuits PNP output 7 2 Dimensions 7 10 WUME SGPUM 2 ...
Страница 69: ... NPN output 7 2 Dimensions WUME SGPUM 2 7 11 ...
Страница 70: ... MEMO 7 12 WUME SGPUM 2 ...
Страница 71: ...8 Appendix 8 1 CE Marking Declaration Conformity 8 2 WUME SGPUM 2 8 1 ...
Страница 75: ... MEMO WUME SGPUM 2 ...