Functions
© Panasonic Industrial Devices SUNX Co., Ltd. 2020
77
5-3-6 Muting maximum continuous valid time
The time the muting state continues to be valid can be set to unlimited (∞), or to a value from 1
to 28,800 sec. (increments of 1 sec.).
5-3-7 Muting indicator disconnection detection
You can select valid / invalid for muting indicator disconnection detection.
The factory setting for the muting lamp diagnosis function is invalid.
When enabling the setting, be sure to connect an indicator to the muting auxiliary output. The
rating of the muting auxiliary output are as follows: 1 to 6 W (40 to 250 mA when 24V is used).
●
Valid
Muting indicator disconnection detection is valid.
●
Invalid
Muting indicator disconnection detection is invalid.
When muting indicator disconnection detection is invalid, the muting state continues even when
a break occurs in the muting indicator wiring.
5-3-8 Override setting
You can set override to valid / invalid.
You can change the override continuous time setting.
The continuous time is 1 to 600 sec. (increments of 1 sec.).
5-3-9 Each beam axis setting
You can select muting function valid / invalid separately for each beam axis.
The factory setting for muting function is valid for all beam axes.
When light is blocked in the muting state in beam axes for which the muting function is set to
invalid, the control output (OSSD1 / 2) turns OFF and the muting state is canceled.
There are two methods of beam axes setting for enabling the muting function: setting by teach
-
ing, and setting by specifying beam axes.
When teaching is used, beam axes that are blocked during teaching are set as valid axes of the
muting function. Setting is not possible when light is received in all beam axes. When light is
blocked in all beam axes, all beam axes become valid axes of the muting function.
To set by specifying beam axes, set muting function valid / invalid separately for each beam
axes.
Содержание SF4D-TM1
Страница 2: ... Panasonic Industrial Devices SUNX Co Ltd 2020 2 MEMO ...
Страница 26: ...Procedures for Operation Panasonic Industrial Devices SUNX Co Ltd 2020 26 MEMO ...
Страница 50: ...Software Tool Panasonic Industrial Devices SUNX Co Ltd 2020 50 MEMO ...
Страница 89: ... Panasonic Industrial Devices SUNX Co Ltd 2020 89 Chapter 6 Troubleshooting ...