
Installation and Settings
WUME-SCHG1C-4
3-10
3-3-5 Procedure for connecting the CC-Link connector
For the communication cable, use a CC-Link dedicated cable (shielded, 3-conductor, twisted pair
cable).
■
Communication cable work procedure
1.
Strip off the jacket on the dedicated cable as shown below. When stripping off the jacket,
take care not to damage the shield braid inside the dedicated cable.
Outer jacket of dedicated cable
Shield braid
Approx. 50mm
2.
Carefully unbraid the shield braid.
3.
Firmly twist together the shield and the stranded wire inside the shield braid.
4.
Cover the twisted shield wires with insulating tubing (obtain separately).
Insulating tube
(Obtain separately)
Shield braid
5.
Strip off the stranded wire (lead wire) jackets as shown below.
Stranded wire (lead wire)
Approx. 3mm
6.
Attach ferrule (sleeve) terminals (obtain separately) to the stranded wire (lead wire) and
shield wire.
Stranded wire (lead wire)
Ferrule (sleeve) terminal
(Obtain separately)
Содержание SC-HG1-C
Страница 2: ...WUME SCHG1C 4 2 MEMO ...
Страница 8: ...WUME SCHG1C 4 8 MEMO ...
Страница 16: ...WUME SCHG1C 4 1 8 MEMO ...
Страница 17: ...2 1 2 System Configuration 2 1 Communication unit system 2 2 2 2 Unit types 2 4 ...
Страница 22: ...WUME SCHG1C 4 2 6 MEMO ...
Страница 106: ...WUME SCHG1C 4 4 72 MEMO ...
Страница 107: ...5 1 5 Specifications 5 1 Specifications 5 2 5 2 Dimensions 5 3 ...
Страница 110: ...WUME SCHG1C 4 5 4 MEMO ...
Страница 111: ...6 1 6 Warranty 6 1 When you purchase and use the product 6 2 ...
Страница 114: ...WUME SCHG1C 4 6 4 MEMO ...
Страница 115: ...7 1 7 Maintenance 7 1 Maintenance and Inspection 7 2 7 1 1 Maintenance cautions 7 2 7 1 2 Main inspection items 7 2 ...
Страница 124: ...WUME SCHG1C 4 8 8 MEMO ...
Страница 125: ...Revision History 1st edition 1 27 2017 2nd edition 9 8 2017 3rd edition 9 30 2019 4th edition 12 1 2019 ...
Страница 126: ... MEMO ...
Страница 127: ... MEMO ...