19
6.3.
Reliability Test Mode (CD Mechanism Unit (BRS1C))
Below is the process flow chart of the aging test for the CD Mechanism Unit (BRS1C).
Fig. 1. Reliability Test (Loading)
Fig. 2. Reliability Test (Traverse)
Fig. 3. Reliability Test (Combination)
OPEN
Operation
OPEN wait
fot 1 s
CLOSE
Operation
CLOSE wait
for 4s
Count up
First Track
Access
First Track
Play 5 s
Last Track
Access
Last Track
Play 5 s
Count up
First Track
Access
First Track
Play 10 s
Last Track
Access
Last Track
Play 10 s
Open
Operation
Open wait
for 1 s
CLOSE
Operation
Count up
Содержание SA-AKX92PH
Страница 13: ...13 5 Location of Controls and Components 5 1 Main Unit Key Button Operation ...
Страница 14: ...14 5 2 Remote Control Key Button Operation ...
Страница 15: ...15 5 3 Media Information ...
Страница 25: ...25 7 2 2 Main P C B Fig 2 Main P C B Connector ZJ2007 Voltage Regulator IC IC2010 DC DC Converter IC IC2011 ...
Страница 27: ...27 7 2 4 Surround D Amp P C B Fig 4 Surround D Amp P C B Audio Digital Amp IC IC5900 ...
Страница 33: ...33 9 2 Main Components and P C B Locations ...
Страница 73: ...73 Step 9 Ground the 24P FFC with a short pin ...
Страница 92: ...92 ...
Страница 93: ...93 14 Simplified Block Diagram 14 1 Overall Simplified Block Diagram ...
Страница 104: ...104 ...
Страница 140: ...140 ...
Страница 157: ...157 MMH1103 ...