
When installing 2 Screws (S-15), slide the Holder Unit of the Cassette Up Ass’y
(Refer to "
METHOD FOR LOADING/UNLOADING OF MECHANISM
" in Service
Notes) to tighten screws. Then, slide it back to the EJECT Position.
Make sure that Mechanism and Cassette Up Ass’y are in the EJECT Position.
(Refer to "EJECT Position Confirmation" in Disassembly/Assembly Procedures.)
5. Removal of Main C. B. A.
Work carefully so as not to break Sensor LED when lifting the Mechanism
Chassis and Cassette Up Ass’y.
Installation of Mechanism Chassis and Cassette Up Ass’y onto Main C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT position. If
not, rotate the Mode Select SW. until the alignment projection is in the EJECT
Position.
B. Make sure the Mechanism and Cassette Up Ass’y are in the EJECT Position.
(Refer to "EJECT Position Confirmation" in DISASSEMBLY/ASSEMBLY
PROCEDURES.)
Fig. D6
C. Install the Mechanism Chassis and Cassette Up Ass’y straight onto the Main
C.B.A. so that the Sensor LED clears the hole in the Mechanism Chassis and
that 4 Connectors (P6201, P6202, P3001, and P4001) are aligned and seated
securely.
6. Installation of Cassette Up Ass’y
68
Содержание PV-DF2700-K
Страница 1: ...ORDER NO MKE0012601C1 B6 TV DVD VCR Combination PV DF2700 K SPECIFICATIONS 1 ...
Страница 2: ...1 1 SAFETY PRECAUTIONS 1 1 GENERAL GUIDELINES 1 IMPORTANT SAFETY NOTICE 2 ...
Страница 11: ...11 ...
Страница 12: ...Fig 1 3 12 ...
Страница 13: ...Fig 1 4 13 ...
Страница 14: ...14 ...
Страница 15: ...Fig 1 5 15 ...
Страница 23: ...5 1 8 SERVICE POSITION 5 1 8 1 Service Position 23 ...
Страница 28: ...28 ...
Страница 30: ...6 Place it along with Guide ribs on the Bottom Frame as shown Fig 7 3 3 30 ...
Страница 37: ...5 1 12 HOW TO INITIALIZE MEMORY IC 37 ...
Страница 40: ...40 ...
Страница 50: ...50 ...
Страница 55: ...55 ...
Страница 57: ...57 ...
Страница 58: ...6 1 2 Disassembly Method 58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...
Страница 61: ...Fig D2 61 ...
Страница 62: ...62 ...
Страница 63: ...Fig D3 63 ...
Страница 64: ...64 ...
Страница 65: ...6 1 2 1 Notes in chart 1 Removal of VCR DVD Ass y Fig D4 2 Installation of VCR DVD Ass y 65 ...
Страница 70: ...6 2 1 Disassembly Reassembly Method 70 ...
Страница 71: ...71 ...
Страница 72: ...6 2 2 Inner Parts Location Fig J1 1 6 2 3 EJECT Position Confirmation Fig J1 2 72 ...
Страница 73: ...6 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 73 ...
Страница 74: ...74 ...
Страница 76: ...6 2 5 Capstan Belt Support Angle Intermediate Gear B and Main Cam Gear Fig J3 1 76 ...
Страница 77: ...77 ...
Страница 84: ...6 2 6 1 Reassembly Notes 1 Installation of Center Clutch Unit 84 ...
Страница 85: ...A Fit the Center Clutch Unit into the Changing Gear Fig J4 2 6 2 7 Reel Gear and Main Rod Fig J5 1 85 ...
Страница 87: ...6 2 8 Stopper Angle Capstan Rotor Unit Oil Seal Capstan Stator C B A and MR Head Fig J6 1 87 ...
Страница 88: ...88 ...
Страница 90: ...90 ...
Страница 93: ...6 2 10 T Brake Unit Tension Control Arm Unit T Reel Table S Reel Table and Tension Arm Unit Fig J8 1 93 ...
Страница 94: ...94 ...
Страница 96: ...6 2 12 Opener Piece Drive Rack Arm Pinch Arm Unit P5 Arm Unit and Intermediate Gear A Fig J10 1 96 ...
Страница 99: ...6 2 13 Motor Block Unit Audio Control Head Unit Lift Gear Capstan Holder Unit and Tension Arm Boss Fig J11 99 ...
Страница 100: ...6 3 CASSETTE UP ASS Y SECTION 100 ...
Страница 101: ...6 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 101 ...
Страница 102: ...102 ...
Страница 104: ...104 ...
Страница 106: ...6 3 2 Opener Lever and Drive Rack Unit Fig K2 7 ADJUSTMENT PROCEDURES 7 1 SERVICE FIXTURES AND TOOLS 106 ...
Страница 112: ...112 ...
Страница 122: ...7 3 3 STEREO SAP SEPARATION ADJUSTMENT Note Remove the DVD unit before performing this adjustment Purpose 122 ...
Страница 131: ...131 ...
Страница 134: ...7 3 9 1 How to adjust 134 ...
Страница 135: ...135 ...
Страница 136: ...136 ...
Страница 146: ...146 ...
Страница 150: ...150 ...
Страница 156: ...156 ...
Страница 160: ...160 ...
Страница 168: ...Fig E15 2 168 ...
Страница 171: ...7 4 TEST POINTS AND CONTROL LOCATION 171 ...
Страница 172: ...172 ...
Страница 173: ...173 ...
Страница 174: ...174 ...
Страница 175: ...8 SCHEMATIC DIAGRAMS 175 ...