297
Se
tt
ing I
n
s
p
e
c
tio
n C
on
d
it
ions
C
h
ap
te
r 4
INDE
X
4.18.3 Registerable Items
The data that can be registered in cells of Data R/W are listed below.
•
“Yes” in the “Change” column indicates the value of the cell is modifiable from Data R/W sheet.
•
The columns of Position Adjustment and Area Size Adjustment show that the item can be registered in
Data R/W or not, when they are used for the adjustments.
Items that can be registered in Data R/W
Statistics group
A number is indicated in "Statistics" column for statistics items. See below.
No.
Numeric Statistics
All Statistics
OK Statistics
NG Statistics
2
Statistics of checker results
If the checker is OK, calculates “All Statistics”
and “OK Statistics”. If the judgement is NG,
calculates “All Statistics” and “NG Statistics”.
Minimum
OK Judge. Min.
NG Judge. Min.
Maximum
OK Judge. Max.
NG Judge. Max.
Average
OK average
NG average
Range
OK Range
NG range
Variance
OK Variance
NG Variance
3
Judgment Statistics
If the checker is OK, calculates “All Statistics”
and “OK Statistics”. If the judgement is NG,
calculates “All Statistics” and “NG Statistics”.
When referring the statistics of
judgments(JDC/JRC) during in RUN mode,
the latest result is referred.
Scan Count
(Judgment
Count)
OK count
NG count
Checker
Position Adjustment (PAC)
Change
Statistics
Parameter
Base Checker Parameter No.0-3 *1)
Yes
No
Result
Judgement
No
3
Inspection time
No
2
Base Position X
No
2
Base Position Y
No
2
Base Position Theta
No
2
Adjustment Amount X
No
2
Adjustment Amount Y
No
2
Adjustment Amount Theta
No
2
Detect Position X
No
2
Detect Position Y
No
2
Detect Position Theta
No
2
Base Judgement Results
No
3
Base Inspection Time
No
2
Base X-Coordinate
No
2
Base Y-Coordinate
No
2
Base Proj. X Axis
No
2
Base Proj. Y Axis
No
2
Area Size Adjustment (AUC)
Change
Statistics
Parameter *2)
Yes
No
Result
Judgement
No
3
Inspection time
No
2
X coordinate
No
2
Y coordinate
No
2
Proj. X
No
2
Proj. Y
No
2
*1) Applies to the items that “Position Adjustment - Base checker” column is “Yes” for each checker
*2) Applies to the items that “Area Size Adjustment” column is “Yes” for each checker
Содержание PV-500
Страница 1: ......
Страница 10: ......
Страница 11: ...9 Names and Descriptions Chapter 1 INDEX Chapter 1 Names and Descriptions ...
Страница 21: ...19 Installation and Wiring Chapter 2 INDEX Chapter 2 Installation and Wiring ...
Страница 37: ...35 Basic Operation Chapter 3 INDEX Chapter 3 Basic Operation ...
Страница 55: ...53 Setting Inspection Conditions Chapter 4 INDEX Chapter 4 Setting Inspection Conditions ...
Страница 315: ...313 Setting of Operation and RUN Menu Chapter 5 INDEX Chapter 5 Setting of Operation and RUN Menu ...
Страница 331: ...329 Environment Settings Chapter 6 INDEX Chapter 6 Environment Settings Changing System Settings ...
Страница 345: ...343 Chapter 7 Changing Configuration INDEX Chapter 7 Changing Configuration TOOL ...
Страница 375: ...373 Operation and Data Output through I O Terminals Chapter 8 INDEX ...
Страница 390: ......
Страница 391: ...389 Control with Communication Port Chapter 9 INDEX Chapter 9 Control with Communication Port ...
Страница 430: ......
Страница 431: ...429 PVWIN Chapter 10 INDEX Chapter 10 PVWIN ...
Страница 437: ...435 Chapter 11 Specifications and List of Product Numbers INDEX Chapter 11 Specifications and List of Product Numbers ...
Страница 493: ......
Страница 494: ......