48
Right rear IH coil assembly
Note:
When setting the IH coil, be sure to set the holes of the IH
coil to the guides, and check that the IH coil moves up and
down.
10.4.3.
Operation Unit
1. Unplug Control lead wire C connector (CN6).
2. Unplug Control lead wire D connector (CN6).
3. Remove Operation unit fixing Screw E (2 pcs) and Screw
C (1 pcs).
Screw E: Panhead P-tite screw 4+12
Screw C: Panhead Deltite screw 4+25
4. Remove the Operation unit.
Содержание KY-B84BXBXD
Страница 2: ...2 1 Safety Precautions ...
Страница 6: ...6 3 3 Location of Controls and Components 3 3 1 Functional Assignments of Boards ...
Страница 7: ...7 4 Location of Controls and Components ...
Страница 8: ...8 ...
Страница 9: ...9 5 Installation Instructions ...
Страница 10: ...10 ...
Страница 11: ...11 ...
Страница 12: ...12 ...
Страница 13: ...13 ...
Страница 14: ...14 ...
Страница 15: ...15 ...
Страница 16: ...16 ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 20: ...20 ...
Страница 21: ...21 ...
Страница 22: ...22 ...
Страница 42: ...42 10 3 Spacer A 1 Remove the Spacer A ...
Страница 46: ...46 3 Unplug the thermistor lead wire connector CN9 4 Remove the rear IH coil ...
Страница 49: ...49 10 4 4 L1 springs 1 Remove the L1 springs 13 pcs KY B84BX B84BG KY B64BX B64BG ...
Страница 59: ...59 11 Maintenance ...
Страница 61: ...61 12 2 Repacking method KY B84BX B84BG BXD ...
Страница 62: ...62 KY B64BX B64BG BXD ...
Страница 63: ...63 12 3 Packing dimension KY B84BX B84BG BXD KY B64BX B64BG BXD ...
Страница 64: ...64 13 Schematic Diagram 13 1 Wiring connection ...
Страница 65: ...65 13 2 Electric circuit KY B84BX B64BX BXD ...
Страница 66: ...66 KY B84BG B64BG BXD ...
Страница 67: ...67 13 3 Wiring treatment ...
Страница 68: ...68 14 Exploded View and Replacement Parts List 14 1 Exploded View KY B84BX BXD KY B84BG BXD ...
Страница 73: ...73 14 4 Exploded View KY B64BX BXD KY B64BG BXD ...