Page 3-3
3
DAIL
Y
PRODUCTION
193C-E-OMA03-A01-02
Before Production
3-1-2
Checking Air Pressure
Make sure a pressure gauge shows
0.49
MPa
or above.
∗
Make sure a lever is ON.
∗
If air pressure is improper, turn the valve to
adjust.
1
Unlock a valve.
2
Adjust it.
3
Lock it.
Valve
Pressure gauge
Lever
To turn it ON,
throw it down.
193C-007P
193C-AB00
ON
Содержание KXF-193C
Страница 2: ......
Страница 28: ...Page 28 193C E OMA00 A04 01 MEMO ...
Страница 64: ...Page 4 6 193C E OMA04 A01 01 MEMO ...
Страница 102: ...Page 7 14 193C E OMA07 A01 01 MEMO ...
Страница 105: ...Page A 1 193C E OMZ0A A01 00 Appendix A MASK FRAME REARRANGING MASK FRAME REARRANGING PROCEDURE PROCEDURE ...