background image

Troubleshooting

16

If you find any problem, please take the following steps to check.

 LED

The POWER (Power) LED is not lit.

  Check if the power cord is disconnected. Please confirm that the power cord is 

securely connected to the power port.

  Is the Ethernet Switch being used at a temperature between 0 and 50

°

C?

    Use the Ethernet Switch in its operating temperature range.

The Port LED is not lit.

  Is the cable correctly connected to the target port?

  Is the cable appropriate to use?

  Are the terminals which are connected to the appropriate ports, 10BASE-T, 

100BASE-TX or 1000BASE-T compatible?

  Auto-negotiation may be failing. 

Set this device’s port setting or the terminal’s setting to half-duplex.

 Communication are slow.

  Are the communication speed and mode settings correct?

  If the proper communication mode signal cannot be obtained, apply 

half-duplex mode.

  Please reconfirm Auto-negotiation setting.

  Is not the utilization ratio of the network to which this Ethernet Switch is 

connected too high?

  Try separating this Ethernet Switch from the network.

 Communication fail.

  Is the link-up correct?

  Depending upon the devices connected, linking may not occur if the Power 

Saving Mode setting and/or the EEE (IEEE802.3az, Energy Efficient Ethernet 
functions) setting is “Enabled” . Change the settings as per the following.

  1. Change the Power Saving Mode setting to "Half" or "Disabled".
  2. Change the EEE (IEEE802.3az) setting to "Disabled".

Содержание GA-AS48T

Страница 1: ...thernet Switch by customers are not covered by the warranty I0317 30222 Printed in Japan GA AS48T PN25481 TH PN25481 MY PN25481 ID PN25481 SG Model No The instruction manuals Web Version latest firmware and SDN application ZEQUO assist Plus can be downloaded from the following URL https panasonic co jp ew pewnw english datadownload index html 2 12 7 Higashi Shimbashi Minato ku Tokyo Japan 105 0021...

Страница 2: ...uct 1 Product Outline 1 1 Feature 1 2 Specifications 1 3 Accessories 1 4 Basic operation 2 Part Names and Functions 3 Installation and Configuration 3 1 Grounding Cable Connection 3 2 Mounting to rack 3 3 Configuration of IP address Basic Troubleshooting 3 6 7 7 8 9 9 10 12 12 13 14 16 ...

Страница 3: ...fire electric shock and or equipment failure Do not connect equipments other than 10BASE T 100BASE TX 1000BASE T to twisted pair port When connecting to a 10BASE T device use a Cat5 or above cable Deviation could lead to fire electric shock and or equipment failure Do not place this Ethernet Switch in harsh environment such as near water high humid and or high dust Deviation could lead to fire ele...

Страница 4: ...d cable AWG18 green yellow to the ground terminal screw Connect the power cord firmly to the power port Deviation could lead to electric shock fire and or malfunction If the STATUS Status LED blinks orange unplug the power cord since this is a malfunction Deviation such as keep connecting for a long time could lead to fire Handle the Ethernet Switch carefully so that fingers or hands may not be da...

Страница 5: ... in the usage environments such as age related degradation etc This may vary depending upon conditions such as utilisation rates and usage environments but performance might decrease due to the age related degradation etc of components It is recommended that this Ethernet Switch be replaced about five years after it has been installed Be careful in regards to environmental restrictions whereby the...

Страница 6: ...Dusty Possible static charge such as carpet Under direct sunlight Possible condensation High low temperature exceeding the specifications environment Strong vibration and or strong shock Please use this Ethernet Switch in place where ambient temperature is from 0 to 50 C Failure to satisfy the conditions above may result in a fire electric shock equipment failure and or malfunction Such events are...

Страница 7: ...e will be moved to whereas each port can suppress power consumption Automatically detects the connection states via the equipped energy efficiency mode and suppresses power consumption to required levels VLAN function allows free grouping of up to 256 VLANs The IEEE802 1p compatible QoS function is supported Has an Internet Mansion function which ensures security between each door As a factory def...

Страница 8: ...n function QoS IEEE802 1p compatible Supports 4 priority queues Management method WEB control screen ZEQUO assist Plus Others Port Monitoring Storm control Power supply AC 100 240V 50 60 Hz 1 5 A Power consumption Normally Max 35 0 W Min 15 3 W Storage environment Temperature 20 70 C Humidity 10 90 RH no condensation Fan Installed Mass Weight 4 600 g External dimensions 44 mm Height 440 mm Width 3...

Страница 9: ...ng with a terminal connected to each port LED of the port lights up When the terminal is not operating normally for example when power is not supplied to the terminal LED is not lighted Quantity Power Cord The following power cords are supplied as per the intended nation of delivery Locale Thailand 250 VAC 6 A TIS166 2549 Indonesia 250 VAC 10 A 250 VAC 10 A 250 VAC 5 A CEE7 7 BS1363 BS1363 13 A 5 ...

Страница 10: ...port Ground terminal Connect the ground cable AWG18 green yellow to the ground terminal screw 10BASE T 100BASE TX 1000BASE T port ports 1 50 Connect 10BASE T 100BASE TX 1000BASE T terminals hubs repeaters bridges and Ethernet Switches Install the device so that the length of the twisted pair cables CAT5e or above will be 100 m or less Front panel Power port MAC Address label Serial number label Po...

Страница 11: ...s normally operating Green Blink After powering on and the system startup is completed blinks for five minutes Orange Light System is starting up Orange Blink System is malfunctioning Port LED Left LINK ACT ports 1 50 LED Green Light Link is established Green Blink Data is being sent received Off No terminal is connected Port LED Left ...

Страница 12: ...ounding cable must be no less than 18 AWG and the length is 50 cm 3 The ground installed screw shall comply with 3 5mm minimum in nominal thread diameter and engage at least two complete threads into metal chassis with appropriate fixing hardware like washer 4 The grounding cable shall not be removed during normal operation servicing or maintenance 5 Installation steps Step 1 Ensure the detachable...

Страница 13: ... the mount brackets to the four holes on each side of the Ethernet Switch Then securely install the Ethernet Switch onto the rack using the four screws for a 19 inch rack mount supplied with the mount brackets PN71051 optional or the screws supplied with the rack Right side Left side Screw holes for fixing the 19 inch rack mount brackets Installation on a rack 19 inch rack mount brackets Front ...

Страница 14: ... the broadcast domain In a few seconds the screen displays the list of detected Ethernet Switches Screen 2 4 From the list of the detected Ethernet Switches select a device that you want to configure In the Setting item field in the lower part of the screen configure Network setting Switch name and other items 5 Fill in the setting items and press the Setting execution button to display the confir...

Страница 15: ... Screen 3 Screen 4 For detailed configuration and management methods and the settings from the ZEQUO assist Plus and the Web screens please see the PDF version of the Operating Instructions on Panasonic s website ...

Страница 16: ...y be failing Set this device s port setting or the terminal s setting to half duplex Communication are slow Are the communication speed and mode settings correct If the proper communication mode signal cannot be obtained apply half duplex mode Please reconfirm Auto negotiation setting Is not the utilization ratio of the network to which this Ethernet Switch is connected too high Try separating thi...

Отзывы: