
6. Finish ceiling work. Ceiling hole should be
aligned with the inside edge of the flange.
(Fig.4)
7. Remove the tape from mounting springs
before installation.(Fig.5)
8. Insert the grille mounting springs into slots
as shown and mount grille to fan body . (Fig.6)
Fig.4
Fig.6
2.
Fix the flange of frame to stud by 2 long
screws(ST4.2x30), and fix the suspension
bracket to stud by 2 long screws(ST4.2x30).
(Fig.7)
3. Complete the
and
(Refer to
step 3 to 5 of INSTALLATION on page 5.).
wiring
duct work
4. Finish the wall work. Wall hole should be
aligned with the inside edge of the flange.
(Fig.8)
4 Long screws
(ST4.0 x 30)
Wall
Wall
Stub
Stud
WALL
1. Before installation, remove the tape from
damper and adaptor, and check that the
damper can open and close smoothly. Then
remove the accessory screws from suspension
bracket. (Fig.1 of page 5)
Fig.7
After finishing the ceiling job, fill gap between
flange and ceiling with caulk or other sealant to
prevent air leakage.
After finishing the wall job, fill gap between
flange and wall with caulk or other sealant to
prevent air leakage.
5. Install the grille (Refer to step 7 to 8 of
.).
INSTALLATION
6
Fig.8
Mounting
springs
Tape
10 1/2 (266)