219
UF-9000
JAN 2004
Ver. 1.0
DP180/190
(11) Install the
Mechanical Counter
.
(12) Secure the
Mechanical Counter
with 1 Screw.
(13) Secure the
MC Harness
with 3 Harness Clamps.
(14) Connect the
MC Harness
to CN302 on the SC
PC Board.
(15) Cut the
Protective Tab
on the Right Cover.
(16) Proceed with the installation of other options.
If finished, reinstall all Harnesses and Covers.
(17) Plug the
AC Power Cord
and turn the Power
Switch on the Left Side of the machine to the ON
position.
(18) Reconnect the
Telephone Line Cable
if it was
disconnected.
Содержание DP-180/190
Страница 48: ...48 UF 9000 JAN 2004 Ver 1 0 DP 180 190 20 Remove the LCD Module 127 ...
Страница 72: ...72 UF 9000 JAN 2004 Ver 1 0 DP 180 190 3 3 Preventive Maintenance Points ...
Страница 123: ...123 UF 9000 JAN 2004 Ver 1 0 DP 180 190 Sensor and Switch Location ...
Страница 169: ...169 UF 9000 JAN 2004 Ver 1 0 DP 180 190 6 3 Printer Receive Mechanism 6 3 1 Component Layout and Paper Path ...
Страница 264: ...264 UF 9000 JAN 2004 Ver 1 0 DP 180 190 memo ...
Страница 266: ...266 JAN 2004 Ver 1 0 UF 9000 DP 180 190 memo ...
Страница 267: ...DZSD001829 6 88 Software Operating Instructions Network Firmware Update Tool Service Tool Version 3 ...
Страница 281: ...DZSD000965 10 Panasonic Software Operating Instructions Local Firmware Update Tool Service Tool Version 3 ...
Страница 295: ...memo ...
Страница 296: ...DZZSM00249 ...