DBS-2.3/9.2-540
T1 Networking-Revised April 2000
Page 11
Chapter 2. System Planning
This section provides system planning guidelines and procedures required for
a DBS T1 Network and provides an example DBS Network Setup. Once this
planning is performed, see Chapter 3 - “
Installation and Quick Start
Programming
” and Chapter 4 - “
Programming Reference
” for programming
instructions.
This chapter covers the following topics.
Topic
Page
System Planning Forms and Guidelines
13
About the Example
13
Network Trunk Configuration and Trunk Routing
15
Network Trunk Group Selection
21
Network Page Group Operation
23
Network Attendant Calling
29
Node Route Selection (NRS)
29
Toll Restriction Service (TRS) Restrictions
38
Forwarding Incoming CO Calls to Another DBS Node
54
SMDR Settings
59
Содержание DBS Section 540
Страница 6: ...Page 6 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 8: ...Overview Introduction to DBS T1 Networking Page 8 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 12: ...Page 12 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 60: ...System Planning System Planning Forms and Guidelines DBS 2 3 9 2 540 T1 Networking Revised April 2000 Page 60 ...
Страница 62: ...Page 62 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 80: ...Page 80 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 100: ...T1 Settings Added for Networking Programming Page 100 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 127: ...Network Feature Operation SMDR DBS 2 3 9 2 540 T1 Networking Revised April 2000 Page 127 ...
Страница 128: ...SMDR Network Feature Operation Page 128 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 140: ...T1 Network Four System Connection Sync Source Examples Page 140 T1 Networking Revised April 2000 DBS 2 3 9 2 540 ...
Страница 146: ...146 T1 Networking Revised April 2000 DBS 2 3 9 2 540 Index ...