
ー
137
ー
Operating Instructions
Intelligent Controller
182
Maintenance settings
Setting
5
Put a check mark in the “Select” column.
z
Select the outdoor units you want to run a test operation for
.
z
You can select multiple outdoor units.
5
6
Touch [Oprn].
z
The operation dialogue is displayed.
6
7
Select the operation mode ([Cool] or [Heat]) (7-1) and touch [ON] (7-2).
z
The settings are registered and the operation dialogue closes.
z
The test operation starts.
7-
1
7-
2
8
Check the “Stus” column.
z
During the test operation, the operation mode is shown in the “Stus” column (
for cooling and
for heating).
9
To stop the test operation, touch [Oprn], then touch [OFF] in the operation dialogue.
Running a test operation
183
Maintenance settings
Setting
The “T
est run” screen
A:
Select the line numbers of the outdoor units you want to run a test operation for
. The “Line No.” dialogue is displayed
when you touch this.
B:
Set the link system of the outdoor units you want to run a test operation for
. The
“Link” dialogue is displayed when you touch this.
C:
Outdoor units are displayed in a list.
Item
Explanation
Slct
Select the outdoor units you want to run a test operation for
.
O/D unit
The outdoor units in the linked system selected at B are displayed.
Stus
The operation mode while testing operation is displayed.
D:
The indoor units that are connected to outdoor units with a check mark in C are displayed.
E:
Test operation is performed.
The operation dialogue is displayed when you touch this.
B
A
C
D
E
Running a test operation
TGR-318_ENG.indb 137
2017/04/06 10:44:34