
Chapter 4. Inserting T17 Transducers into the Pipe
36
Model T17 Installation Guide
4.2.2 Mounting the Insertion Mechanism
1.
Before mounting the mechanism on the isolation valve, refer to
below to familiarize yourself with its
components:
• junction box
• barrel
• packing gland
• transducer
Note:
Explosion-proof boxes may not be mounted on the end of a transducer during shipment.
IMPORTANT:
For an extended range operation meter, the upstream and downstream transducers are different, and it
is crucial to the meter operation that the correct transducer be installed in the correct location. The
upstream transducer has a 180° head, the downstream transducer has a 6° offset, or 174° head, and the
insertion mechanism and transducer have alignment marks.
Figure 7: Insertion Mechanism Assembly with T17 Transducer
Junction Box
Packing Gland
Barrel
Transducer
Содержание T17
Страница 1: ...panametrics com Flow 916 128 C August 2021 Model T17 Ultrasonic Flow Transducer Installation Guide...
Страница 2: ......
Страница 4: ...ii no content intended for this page...
Страница 7: ...Model T17 Installation Guide v Chapter...
Страница 8: ...Chapter vi Model T17 Installation Guide no content intended for this page...
Страница 10: ...Contents viii Model T17 Installation Guide...
Страница 11: ...Model T17 Installation Guide ix Contents...
Страница 12: ...Contents x Model T17 Installation Guide...
Страница 46: ...Chapter 3 Installing an Isolation Valve 34 Model T17 Installation Guide...
Страница 64: ...Chapter 4 Inserting T17 Transducers into the Pipe 52 Model T17 Installation Guide...
Страница 70: ...Chapter 6 Specifications 58 Model T17 Installation Guide...
Страница 72: ...Warranty 60 Model T17 Installation Guide no content intended for this page...
Страница 74: ...2 Model T17 Installation Guide...
Страница 75: ......