
DigitalFlow™ XGF868i Startup Guide
39
Chapter 4. Operation
Chapter 4. Operation
4.1 Introduction
See Chapter 1,
Installation
, and Chapter 2,
Initial Setup
, to prepare the XGF868i system for operation. When the meter
is ready to take measurements, proceed with this chapter. The following specific topics are discussed:
•
Powering Up
•
Using the Display
•
Taking Measurements
•
Recording Diagnostics
Note:
All inputs and outputs of the XGF868i are calibrated at the factory, prior to shipment. If it becomes
necessary to recalibrate any of the inputs and/or outputs, see Chapter 1,
Calibration
, of the
Service Manual
for instructions.
WARNING!
To ensure the safe operation of the XGF868i, it must be installed and operated as
described in this manual. In addition, be sure to follow all applicable local safety
codes and regulations for the installation of electrical equipment.
Содержание DigitalFlow XGF868i
Страница 2: ......
Страница 4: ...ii no content intended for this page...
Страница 7: ...DigitalFlow XGF868i Startup Guide v Preface...
Страница 8: ...Preface vi DigitalFlow XGF868i Startup Guide no content intended for this page...
Страница 34: ...Chapter 1 Installation DigitalFlow XGF868i Startup Guide 24...
Страница 46: ...Chapter 2 Initial Setup 36 DigitalFlow XGF868i Startup Guide...
Страница 48: ...Chapter 2 Initial Setup DigitalFlow XGF868i Startup Guide 38...
Страница 68: ...Appendix A CE Mark Compliance 58 DigitalFlow XGF868i Startup Guide...
Страница 74: ...Appendix B Data Records 64 DigitalFlow XGF868i Startup Guide...
Страница 80: ...Index 4 DigitalFlow XGF868i Startup Guide...
Страница 82: ...Warranty 6 DigitalFlow XGF868i Startup Guide...
Страница 84: ......
Страница 86: ......
Страница 88: ......
Страница 89: ......