background image

Catalog No. 66163 * Version #3

EuroStyle 6’X8’

Greenhouse

255x193x203 cm / 100”X76”X80”

Keep these instructions in a safe place for future reference.

You must read these instructions carefully before you start to assemble

this greenhouse. Please carry out the steps in the order set out in these

instructions.

Do not tighten the screws of the Greenhouse until completing on the

assembly of the panels.

We strongly recommend the use of work gloves during assembly . Do not attempt to

assemble the greenhouse in windy or wet conditions.

Do not touch overhead power cables with the aluminum profiles. Always wear shoes

and safety goggles when working with extruded aluminum. Dispose of all plastic bags

safely - keep them out of reach of small children. The greenhouse must be positioned

and fixed on a flat level surface. Do not lean against or push the greenhouse during

construction. Keep children away from the assembly area. Do not position your greenhouse

in an area exposed to excessive wind.

Do not attempt to assemble this greenhouse if you are tired, have taken drugs or alcohol

or if you are prone to dizzy spells. If using a step ladder or power tools ensure that you

follow the manufacturers safety advice. Hot items such as recently used grills, blowtorches

etc. must not be stored in the greenhouse. Ensure there are no hidden pipes or cables

in the ground before inserting the pegs.

SAFETY ADVICE

GENERAL ADVICE

Inventory all parts before beginning the assembly process to ensure that there are no

missing parts. This is a multi-part assembly that typically requires at least 3 hours. To be

conservative, please allow at least 6 hours for assembly process to ensure time for

completion..
Selecting a site - choose a sunny level position away from overhanging trees. If you are

fixing your greenhouse directly to a solid concrete foundation use the pre drilled holes

in the metal base supplied. The component parts should be checked and laid out close

at hand. Keep all small parts (screws etc.) in a bowl so they do not get lost.

Keep roof clear of snow and leaves.

When your greenhouse needs to be cleaned, use a mild detergent solution and rinse

with cold clean water. DO NOT use acetone, abrasive cleaners or other special detergents

to clean the clear panels.

Replacement parts - contact Customers service helpline at: 877-627.8476.

For additional information please visit our web site: www.palramapplications.com

CARE & MAINTENACE

TOOLS & EQUIPMENT

- Silicone sealant applicable to panels & Applicator

- Tape measure

- Work gloves

- Plastic or rubber mallet

- Lubricant

- Phillipshead

-- Step ladder

- Drill

- Large hammer

- Scissors

- 2mm (5/64) metal drill bit

If help is required seek professional advice whithin store.

IMPORTANT

ASSEMBLY INSTRUCTIONS

Содержание 701550

Страница 1: ...c must not be stored in the greenhouse Ensure there are no hidden pipes or cables in the ground before inserting the pegs SAFETY ADVICE GENERAL ADVICE Inventory all parts before beginning the assembly...

Страница 2: ...he outside and nuts 412 from the inside of the greenhouse Close screws and nuts 411 412 2 3 turns only do not fasten them until completion of the assembly if not specified otherwise Prefix of the part...

Страница 3: ...3 2457mm 2 A141 97 2463mm 1 A151 23 07 586mm 1 A171 59 65 1515mm 2 A172 24 17 614mm 1 A181 24 17 614mm 1 A201 61 48 1560mm 1 A202 61 48 1560mm 1 A211 24 25 616mm 1 A221 48 82 1240mm 1 A231 23 82 604mm...

Страница 4: ...23 62 x21 65 1 600X550 mm Item Qty Inc mm Item Qty Inc mm P311 44 09 1120mm 42 P312 61 42 1560mm 6 P313 9 84 250mm 2 P314 28 74 730mm 2 P315 14 17 360mm 2 R303 59 6 1515mm 2 4 P324 P302 A306 A323 M30...

Страница 5: ...mly the screws 447 at the lower hole as seen in the lower picture Attach the sides of the base M244 to the front and back base pieces M243 Use the aluminum screws and nuts 411 412 as shown Tighten nut...

Страница 6: ...1 should be done simulataneously with profile A111 The other side of profile A161 will be connected later NOTE The nuts are to be from the inside Do not tighten them until completion of the assembly I...

Страница 7: ...4 Insert the screws from the outside tighten nuts only 2 3 turns and leave loose BACK a A112 A111 A112 A111 411 A111 411 412 QTY 2 A111 A112 A111 2 FROM THE INSIDE...

Страница 8: ...253 NOTE Profiles A256 are assembled from the inside The upper holes will be used later on Insert the screws from the outside tighten nuts only 2 3 turns and leave loose 5 BACK A256 A256 411 412 A256...

Страница 9: ...end cups P324 and four plugs Assemble a plug in all four gutter end cups P324 Insert each one of them into the gutters A131 ends NOTE Leave the end cup open on the side you would like the water to dra...

Страница 10: ...aneously with the gutter A131 using the same screws and nuts The oval holes in A256 must be connected to the base of the greenhouse Insert the screws from the outside tighten nuts only 2 3 turns and l...

Страница 11: ...hould be parallel to the downward slope of the roof The other end should be insert onto the head of screws 411 connecting the crossbars to the base Insert one screw 411 in each profile A103 A104 and c...

Страница 12: ...ously with the profiles A254 and profiles A111 and A112 using the same screws and nuts The oval holes must be connected to the base of the greenhouse BACK A202 A256 A256 A254 OUTSIDE 411 412 A256 INSI...

Страница 13: ...the back to aluminum profile A253 on its two sides using the upper holes Profiles A113 A114 A115 A116 are to be also connected Simulaneously to profiles A131 A116 411 412 411 411 411 411 412 412 412...

Страница 14: ...t the FRONT A115 and A116 at the BACK A141 411 412 411 412 A211 411 412 412 411 QTY 1 A141 QTY 1 A211 11 Insert the screws from the outside tighten nuts only 2 3 turns and leave loose Assemble profile...

Страница 15: ...gutter A131 and close DO NOT TIGHTEN with nut 412 NOTE Repeat the above assembly procedure to all six profiles A102 You will have to add one screw 411 and nut 412 to each side of the base in order to...

Страница 16: ...ide the head of screw 411 into the groove on profiles A102 insert the screw into predrilled holes in the gutter A131 and close DO NOT TIGHTEN with nut 412 412 411 A102 A102 a b 412 411 Insert the scre...

Страница 17: ...insert an additional screw 411 b into two profile A102 b on both sides of the vent before you connect it These two additional screws will be used in the next step 411 412 a a b 411 A102 a 411 412 411...

Страница 18: ...1 a b A211 412 411 442 412 441 b A261 412 441 A261 442 441 c Assemble aluminum profile A221 onto aluminum profile A211 a Connect aluminum profile A221 b and aluminum profile A261 to profile A113 c QTY...

Страница 19: ...own below and tighten all screws Door Assembly When inserting the plastic part No P301 to aluminum Profile A191 use plastic or rubber mallet After you inserted part A301 push it in approximately 2 50m...

Страница 20: ...the grooves on both sides of the panel are properly positioned along the aluminum extruded profiles C D B D C B A A 19 20 QTY 1 P502 During the assembly of plastic strips you must put pressure on the...

Страница 21: ...QTY 2 P313 21 A231 411 412 A181 412 411 412 A231 A181 Lay profile A231 on profile A181 and connect them with screws and nuts 411 412 22 A231...

Страница 22: ...1 443 QTY 421 P302 2 2 QTY 443 422 4 2 23 Assemble of the wheels to profile A231 Note Make sure to assemble all parts in the order described in illustration below Part No 443 must be assembled one und...

Страница 23: ...2 c 422 A306 421 A271 a When inserting the rubber R303 apply some lubrication solution on the aluminum A171 R303 24 25 QTY 2 R303 QTY 1 A151 Connect corners with screws 411 and nuts 412 Slide the fina...

Страница 24: ...at an angle of 45 relative to the profile s plane Slide it to the position between the two roof aluminum profiles AI02 b The handle A306 should rest on brackets A323 when the vent is in the closed pos...

Страница 25: ...QTY 14 P317 28 P317 P317 P317 Noise reduction elements assembly Put one part of P317 in the middle of each section of the wall as shown in the picture below it will be used later on...

Страница 26: ...panel are properly positioned along the aluminum extruded profiles See also next step During the assembly of the plastic strips you must put pressure on them until they snap into place Put the pressur...

Страница 27: ...ld be installed only after the polycarbonate panels P505 P514 and P515 P516 are in position see previous step P502 P502 P502 P502 P502 P502 P502 P314 P515 P514 P515 P312 x2 P502 P516 P315 P505 P514 1...

Страница 28: ...in the picture below Noise Reduction elements assembly Insert one part P316 in the middel of each of the roof panels and push it in the groove of the gutter A step ladder will be needed for this step...

Страница 29: ...ide the special aluminum rail A161 a It is advised to spread some tender lubrication on the rail After you assemble the door to its place assemble screw and nut 411 412 into the door stopper hole on p...

Страница 30: ...led final position IMMEDIATELY after completion of the assembly to withstand high winds effects The pegs M307 spikes are assembled from the inside of the greenhouse Make sure to use the pre punched no...

Отзывы: