Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can
comprise several parts! In this case, these parts will have to be screwed together prior to other
actions). Having installed the last wall logs, place the apex on the front and back walls and attach
them with screws.
The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring
that the roof is placed firmly and in the right place.
Now place the purlins in the
corresponding
indents
in
the
apexes.
Make sure that the upper wall log,
apexes and purlins are level.
Having fitted the purlins, screw
them onto the apex from above.
Installation of purlins:
ATTENTION
: If the wall logs are not properly pressed on top of one another without gaps, the upper
wall log may not be on the same level with the apexes. In this case you should tap the wall logs
downwards as necessary or plane the apex or sidewall log somewhat lower.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION
: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Begin the installation of the roof boards
from the front edge of the roof
. Tap the boards lightly and
attach them from above and below with nails to the purlins and upper wall log.
ATTENTION
: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.
•
During the whole process of installing the roof boards, make sure that their crest purlins coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.
•
The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the purlin ends.
Содержание FR19-2118
Страница 5: ...2 9 m2 190 160 222 180 ...
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ... 16 0 ...
Страница 13: ......
Страница 14: ......
Страница 15: ...1600 1900 A B A B EN Laying on concrete slabs not included FR Pose sur dalle béton non inclus ...
Страница 17: ...001 x14 006 x28 008 x28 001 008 006 008 ...
Страница 20: ...200 1 2 PR1 x2 StB1 1 x4 M8x60 x8 Ø5x90 x4 200 Ø8 1 Ø8 1 Ø3 1 58 20 M8x60 M8x60 Ø5x90 PR1 StB1 1 ...
Страница 21: ...RB1 1 x40 Ø2 5x50 x120 ...
Страница 22: ...YPapp 1 RB1 1 RE1 1 Ø3x30 1 2 RE1 1 x2 x3 Ø2x16 x100 Ø3x30 x12 YPapp 1 RE1 1 ...
Страница 23: ...1 2 Ø2 1 FaB3 1 x4 WB1 1 x4 Dia 1 x2 Ø3 5x40 x36 FaB3 1 WB1 1 Dia 1 ...
Страница 25: ...Sla1 250 300 Ø2 1 Ø4x16 Ø4x16 Ø3 5x25 Ø10 20mm Ø10 20mm 1 2 5 5 5 Ø3 5x25 Ø3 5x25 Ø2 1 ...