Installation manual
– English
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Door and window
Doorframe:
➢
If it is a double door, the
doorframe
is
supplied
in
separate
parts
due
to
transportation requirements and
you will have to begin by
assembling it.
➢
To do this, place together the 4
parts of the frame and screw
them onto one another.
➢
Make sure that the part of the
frame with the deeper notch is
installed upwards. The lateral
jamb parts have hinges and are
mirrored.
➢
It is recommended to install the
leaves later.
➢
If it is a single door, its frame and
leaf
are
supplied
already
assembled.
Doorframe installation (Only necessary for a double door!):
Door installation:
The doorframe is placed at the
formed aperture and pushed with
force onto the lower log. If it is a
double door, place the leaves on the
hinges now. To open and close the
door, fit the separately packaged lock
and handle.
Window installation:
Continue with the installation of the wall logs until you reach the window height. The wall plans (see
Technical specifications) show how many logs go under the window. Install the window similarly with
the door. Just like the door, push the window frame with the window into the window aperture onto the
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).
ADVICE
: Definitely make sure that the windows and doors open in the proper direction. The doors
always open from the inside
to the outside
. The tilt&turn windows open
to the inside
. The revolving
and the slinging windows open
to the outside
(the window handles are on the inside).
ATTENTION
: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it
will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry,
the wall logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house
installation, when the house will have become adapted to weather conditions and its logs settled.
Содержание FR19-2118
Страница 5: ...2 9 m2 190 160 222 180 ...
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ... 16 0 ...
Страница 13: ......
Страница 14: ......
Страница 15: ...1600 1900 A B A B EN Laying on concrete slabs not included FR Pose sur dalle béton non inclus ...
Страница 17: ...001 x14 006 x28 008 x28 001 008 006 008 ...
Страница 20: ...200 1 2 PR1 x2 StB1 1 x4 M8x60 x8 Ø5x90 x4 200 Ø8 1 Ø8 1 Ø3 1 58 20 M8x60 M8x60 Ø5x90 PR1 StB1 1 ...
Страница 21: ...RB1 1 x40 Ø2 5x50 x120 ...
Страница 22: ...YPapp 1 RB1 1 RE1 1 Ø3x30 1 2 RE1 1 x2 x3 Ø2x16 x100 Ø3x30 x12 YPapp 1 RE1 1 ...
Страница 23: ...1 2 Ø2 1 FaB3 1 x4 WB1 1 x4 Dia 1 x2 Ø3 5x40 x36 FaB3 1 WB1 1 Dia 1 ...
Страница 25: ...Sla1 250 300 Ø2 1 Ø4x16 Ø4x16 Ø3 5x25 Ø10 20mm Ø10 20mm 1 2 5 5 5 Ø3 5x25 Ø3 5x25 Ø2 1 ...