75
11.2. Performing acceptance test as per test book
►
Perform initial commissioning in accordance with the test book.
►
Enter the required details in the test book:
•
Company
•
Code
•
Installation company
•
Details of signatory
►
It is essential that you enter the details on the operator and vehicle as well
as the form “Confirmation by the installation firm” in the test book.
Note:
The test book as well as the further documents from the
PALFINGER
document pouch (operating manual, short operating manual, attachment
report, certificates) should always be kept in the vehicle.