ENGLISH
INSPECTION AND MAINTENANCE PLAN
WHENEVER
STARTED
WEEKLY
1 MONTH
1 YEAR
(a)
Burn pot
X
Ash bin/Compartment
X
Glass
X
Heat exchanger
X
Ignition heater socket
X
Flue gas manifold
X
Door and burn pot gaskets*
X
Flue*
X
Fans*
X
(*)
responsibility of the Authorised Service Centre.
(a)
This must be done at least once a year, or every 4 tons of pellets.
8 DECOMMISSIONING
AND DISPOSAL
Decommissioning and disposal of the stove are the
exclusive responsibility of the owner, who must act
in accordance with the laws in force in the country
where the stove is installed with regards to safety
and environmental protection.
The stove may also be dismantled and disposed of
by companies authorised to recover and dispose
of the materials in question.
INSTRUCTION
: always observe the standards
in force in the country where the stove is
decommissioned as regards disposal of the
materials and the waste disposal report where
required.
IMPORTANT
: All dismantling operations for
decommissioning the stove must be performed
when the stove is off and disconnected from the
power supply.
remove all electrical equipment;
separate
the
batteries
¿
tted on the electronic
boards;
have the structure of the stove scrapped by an
authorised company;
IMPORTANT
: Dumping the stove in accessible
areas represents a serious hazard to people and
animals.
Liability for any harm caused to people or animals
always lies with the owner.
When decommissioning the stove the ce mark, this
manual and other documents relating to this stove
must be destroyed.
43
Содержание ECOFIRE WILMA IDRO 18
Страница 24: ...24 ...
Страница 46: ...46 ...
Страница 68: ...68 ...
Страница 90: ...90 ...
Страница 112: ...112 ...