15
MA50-24 GB 2022
ENGLISH
A
rt.no.
R
ev
.no
.
S
ca
le
D
esi
gn
ed
by:
A
pp
rov
ed
by:
R
ev
is
ed
by
: D
at
e
D
ra
w
n
by:
Date
D
ra
w
ing
nu
m
be
r
As
sem
bly
dr
aw
ing
no
.
S
ur
fa
ce
trea
tm
ent
pa
rt of
ISO
276
8-
1
Th
e tolera
nc
e c
lass
in ac
cordance
wi
th
this
E
Bo
x 7
28,
SE-
194
27
U
ppl
ands
Väsby
, Sw
eden
Ph
one
+4
6 8
5941
105
0,
Fa
x
+4
6 8
5908
688
0
A
SA
20
16-
03-
31
hus
o
ring
M12646-0
Bottensugkontakt / Vacuum Point
UP
Inloppsmunsty
cke
/ Inlet
Sugmunstycke
/ Outlet
Spa-belysning
/ Spa
light
UP
6 (4x)
30
° (4
x)
78
70-76
Inloppsmunstycke / Inlet
Sugmunstycke / Outlet
Spa-belysning / Spa light
30° (4x)
78
70-7
5
Bo
tten
sug
kon
ta
kt
/
Va
cuu
m
P
oint
UP
UP
6 (4x)
CA-350 50AP
Install as below:
1. Drill holes in the frame according to the dimension drawing.
Recommended depth for the light is 300–800 mm down from the swimming pool’s edge.
2.
Install the injection pipe with the attached mounting ring and screw from the inside of the pool (see drawing).
The injection pipe should be rigidly fixed or relieved in order to avoid breaking the pool frame.
3.
Fix the adhesive gasket on the flange.
4. Install the plug in the rear edge of the injection pipe. When the O ring is used, no other gasket is needed.
5.
Alternative 1:
Install the cable gland in the plug. Use the included O ring and ensure that it is in the right place. No further
gasket is needed here.
Alternative 2:
Install the conduit in the plug. Seal with thread tape or thread string.
6.
Install the pool liner according to the manufacturer’s instructions and begin filling with water.
7. When the water reaches approximately 5 cm below the flange of the injection pipe, install the sealing ring and the gasket
with 6 bolts.
8. Trim the liner following the sealing ring’s inner edge.
9. Thread the cable into the cable gland/conduit and pull it out at the back of the injection pipe.
Leave enough cable (max 1m) at the front to enable the latter to lift the light above the surface of the water. This facilitates
future change of lamp or winter closure.
10. Thread the sealing sleeve on the cable of the LED module. The sealing sleeve shall be placed in the middle of the rubber of
the cable gland.
Alternative 1:
Tighten the cable gland so that the cable is securely attached.
Alternative 2:
Connect the conduit to the connection box with the cable gland. Tighten the cable gland so that the cable is
securely attached.
11. Push the LED module cable into the injection pipe.
Marine:
Clip the LED module with the support under the front. Tighten the two bolts.
Classic:
Clip the LED module with the front. Tighten the two bolts.
12.
Fill up the pool with water to the desired level.
UP
NOTE! Not 1:1 scale
for technical reasons
Dimension drawing
for holes in the pool wall
Sealing ring
UP
Flange
UP
Continued (For the pool frame of wood, metal or plastic - finished with liner)