3.

 

Start-up and normal use 

3.1.

 

Filling PIB 

The Packo Ice Builder has to be filled with pure, clear water (drinking quality) up 
to 1cm above the top copper tube of the evaporator. 

The ice water reservoir may only be filled with water after the 

cooling circuit has been made vacuum and put under pressure. 

To protect the system an inhibitor must be added to the water before 

the start-up. 

 

The PIB can be filled automatically by following these steps: 

 

Step 

Action 

Place the switch “Level control” in position A which will open the water 
supply valve. 

The filling cycle will automatically stop when the required level has been 
reached. 

Remove the cover. 

Add the amount of 1, 2, 3-Benzotriazol needed to the ice water reservoir. 
For the required dosage please check Manual for installation/ operation/ 
maintenance, chapter “4. Maintenance”.  

Put the cover plate back in place. 

 

 

Содержание Eco Cool Ice Builder

Страница 1: ...User Manual Packo Ice Builder PIB Ref 168042 V 2 00 Eco Cool Torhoutsesteenweg 154 B 8210 ZEDELGEM Tel 32 50 25 06 10 Fax 32 50 20 07 52 E mail inox packo com Ref 168042 ...

Страница 2: ...ual Packo Ice Builders 2 Table of contents ABOUT THIS MANUAL 3 SAFETY INSTRUCTIONS 4 1 EQUIPMENT OVERVIEW 6 2 ELECTRICAL CONTROL PANEL 8 3 START UP AND NORMAL USE 12 3 1 FILLING PIB 12 3 2 PIB OPERATION 13 ...

Страница 3: ...ur attention to for example safety information The table below provides an overview of the icons used and what they mean Icon Meaning Description Remark A remark provides additional information about a certain topic The information in a remark is not invaluable but can be useful Attention If you do not follow the directions precisely then The system can be damaged in this case damage is not covere...

Страница 4: ...cording to the CE regulations You are invited to read the instructions Danger Machinery equipment connected to electrical network Do not spray water on the motor Do not spray water on the pump The operator needs to read this manual carefully before using the PIB Service or maintenance works should only be carried out by trained personnel Before doing the following turn the main switch located on t...

Страница 5: ...m Make sure that your hands are dry when you use the buttons When you touch electronic equipment make sure you unload yourself of static electricity Never spray water under high pressure at the PIB Wear protective gloves and safety goggles whilst cleaning the equipment Only use the PIB for its intended use which means the creation of ice water The PIB is not suitable for cooling other liquids then...

Страница 6: ...pment overview The Packo Ice Builders PIB are compact and powerful units capable of storing cooling energy in ice form and afterwards releasing this energy by generating ice water for various cooling applications 1 2 3 4 5 6 7 8 9 10 11 ...

Страница 7: ...ower is automatically turned on when the ice water pump is running 7 Leg Adjustment levelling of the PIB 8 Evaporator Cool freeze the water in the ice water reservoir 9 Return header Distribute the return heated water back into the PIB 10 Electronic ice thickness sensors Control the thickness of the ice layer between the pre set minimum and maximum value 11 Automatic ice water level control Mainta...

Страница 8: ...Manual Packo Ice Builders 8 2 Electrical control panel Main Switch Cooling unit 2 Cooling unit 1 ...

Страница 9: ...nit 1 0 off 1 on 25S2 Knob Boost function cooling unit 1 Push built up once to max ice limits 25S3 Switch Clock switch cooling unit 1 Auto no clock is used Clock Clock is used 25H1 Lamp Cooling active Liquid valve 0 off 1 on 26H3 Lamp BP OK On when BP is closed and Cooling is active 26H4 Lamp HP Compressor 1 OK On when HP is closed and BP is closed and cooling is active 26H6 Lamp ThKa Compressor 1...

Страница 10: ...ing active Liquid valve 0 off 1 on 31H3 Lamp BP OK On when BP is closed and Cooling is active 31H4 Lamp HP Compressor 1 OK On when HP is closed and BP is closed and cooling is active 31H6 Lamp ThKa Compressor 1 OK Indicates when compressor 1 cooling unit 2 is running On when ThKa is closed and HP is closed and BP is closed and cooling is active 31H5 Lamp Model dependant HP Compressor 2 OK On when ...

Страница 11: ...s overloaded 45S2 Switch model dependant Ice water pump 2 8 M 0 A M Manual operation 0 Pump off A Automatic operation 47H4 Lamp Model dependant Thermal Safety ice water pump 2 Indicates when ice water pump 2 is overloaded Level control 55S1 Switch Level control M A M Manual operation A Automatic operation ...

Страница 12: ...system an inhibitor must be added to the water before the start up The PIB can be filled automatically by following these steps Step Action 1 Place the switch Level control in position A which will open the water supply valve 2 The filling cycle will automatically stop when the required level has been reached 3 Remove the cover 4 Add the amount of 1 2 3 Benzotriazol needed to the ice water reservo...

Страница 13: ...ontrol switch in position M Automatically the ice water pump is controlled by an external source Put the control switch in position A 4 When the ice formation has reached the required level the valve controlling the flow of cooling agent is closed and the cooling units are stopped During a prolonged period without ice building cooling units are not running the cooling units can switch on and off f...

Отзывы: