Packet Power BGS32 Скачать руководство пользователя страница 13

Packet Power Multi-Circuit Monitor BGS32 User Manual V2.0 

 

© 2021 Packet Power, LLC 

 

Page 13 of 29  

Voltage Connection 

 

A three-pole breaker should be used to provide over-current protection and a 
means of disconnecting power from the BGS32. If a three-pole breaker is not 
used, you must ensure suitable over-current protection is provided.

 

 
The BGS32 comes pre-wired. It is configured to work with one of the supported voltage 
types. Unless otherwise specified, the unit has inline fuses on each voltage phase. The wire 
count and color mix will vary based on the voltage service type (see diagrams on the 
following pages). 

 

Voltage leads 

 

18 AWG 600V wires which are connected to a 6-position terminal block inside the 
enclosure are provided for use in routing power to the device.  

 

Voltage lead lengths are sized to specification. They may include a voltage 
disconnect near the BGS32 that is used to avoid placing strain on the connection to 
the terminal block during shipping and installation.  

 

5x20 mm 5A inline fuses are included on L1, L2 and L3 unless otherwise specified. 

 

An optional second voltage source can be included. If a second voltage lead is 
included, the voltage leads will be labeled accordingly. 

 

Wire connections 

The BGS32 uses different wire colors depending on service type and region. Run the voltage 
leads to the voltage source and connect them to L1, L2, L3, N and earth. Reference wire 
connections by service type on the following pages.  
 
Verify that the wires are connected to the proper phases for your type of voltage service. 
 
No changes should need to be made to any wiring within the BGS32 device itself. 
 

Grounding 

The BGS32 enclosure must be properly connected to earth. A ground wire is provided for 
this purpose.  

 

Failure to properly ground the unit could result in a dangerous or fatal 
electrocution. 

 

Once power is supplied the BGS32 will automatically begin to transmit data. 
 

 

Содержание BGS32

Страница 1: ...Multi Circuit Monitor BGS32 User Manual Version 2 0 BGS32 Multi Circuit Monitoring System Installation Operations and Maintenance Manual Version 2 0 Packet Power 2716 Summer St NE Minneapolis MN 55413...

Страница 2: ...ice Current transformers shall provide two means of isolation from hazardous voltages When selecting a current transformer the voltage and measurement category of the circuit to be measured must be co...

Страница 3: ...ailure to observe the information following this symbol may result in injury or death CAUTION This system and the area it is installed in may contain life threatening voltages Qualified personnel must...

Страница 4: ...ssembly This product has been tested to the following requirements UL508A Industrial Control Panel Class B Device Statement Section 15 105 a of the FCC Rules This equipment has been tested and found t...

Страница 5: ...a supplement to information provided in the support section of Packet Power s web site www packetpower com support The BGS32 must be used in conjunction with a Packet Power Ethernet Gateway Detailed...

Страница 6: ...rrent Transformers 7 Communication 8 Components 9 SECTION 3 INSTALLATION 10 Installation Overview 10 Mounting 11 Voltage Connection 13 CT Interconnect Cables and Boards 16 CT Leads 16 CTs 17 SECTION 4...

Страница 7: ...ou are monitoring matches the type indicated on the label of the BGS32 The BGS32 cannot be used on 480V equipment if access to N is not present nor on 600 347V circuits The BGS32 is powered from the v...

Страница 8: ...ateways can be added for capacity or redundancy The BGS32 must be able to establish a wireless connection either directly to a Gateway or to another Packet Power wireless device Data can be accessed f...

Страница 9: ...tor BGS32 User Manual V2 0 2021 Packet Power LLC Page 9 of 29 Components The BGS32 consists of a NEMA 1 monitoring enclosure two CT interconnect boards with loose CT leads or wire harnesses for attach...

Страница 10: ...list of safety instructions in the Hazards sections of this document Installation Overview The BGS32 does not need to be configured prior to use 1 Mount the BGS32 to wall or device using mounting tab...

Страница 11: ...2021 Packet Power LLC Page 11 of 29 Mounting The BGS32 should be mounted as close as possible to the equipment being monitored Mounting locations Use the mounting tabs provided for wall mount or the...

Страница 12: ...r wire exits in the back bottom and on each side of the enclosure allowing it to be mounted in a variety of positions relative to the equipment being monitored Wire exit location Description Bottom 1...

Страница 13: ...ge disconnect near the BGS32 that is used to avoid placing strain on the connection to the terminal block during shipping and installation 5x20 mm 5A inline fuses are included on L1 L2 and L3 unless o...

Страница 14: ...Packet Power Multi Circuit Monitor BGS32 User Manual V2 0 2021 Packet Power LLC Page 14 of 29 Voltage wire connections by service type...

Страница 15: ...Packet Power Multi Circuit Monitor BGS32 User Manual V2 0 2021 Packet Power LLC Page 15 of 29...

Страница 16: ...sure to orient the CT Interconnect Board so the black connector header faces away from the circuits or panel Attach Interconnect Cables to Interconnect Boards Attach the connector at the end of the C...

Страница 17: ...ch CT lead will have a label standard labels are CT1 CT2 CT3 etc CTs The BGS32 supports 9 to 32 split core or Rogowski coil CTs of varied amperage and size SPLIT CORE CTs Split core CT Specifications...

Страница 18: ...d into place Connect CT tails to CT leads CT leads coming from the CT Interconnect Board will typically be labeled CT1 CT2 CT3 etc unless otherwise specified Connect the CT tail to the corresponding C...

Страница 19: ...ion the coil on the conductor such that the arrow on the connector faces toward the load and away from the source 4 Close the Rogowski coil and ensure the closing unit has clicked into place Connect R...

Страница 20: ...and associates each CT to its component meter See Appendix for sample This documentation is required in order to access readings using protocols such as SNMP or Modbus Customers using Packet Power s...

Страница 21: ...es Follow the wire harness on the side of the terminal block that feeds into the BGS32 to locate the inline fuse holders Open each fuse holder and inspect for blown fuses Replace with 5x20mm glass 5A...

Страница 22: ...en entered on the master gateway If V readings are present but A and W are missing o If only one reading is missing follow the process listed in the Maintenance section of this document to remove the...

Страница 23: ...ENANCE Equipment Parts List Contact Packet Power support if you encounter issues related to any parts or before attempting any repairs Of these items the following can be replaced in the field by qual...

Страница 24: ...LIT CORE CT 1 Disconnect power to the BGS32 if possible If it is not possible to disconnect power always treat CT leads as though they carry line voltages Work on live panels must only be performed by...

Страница 25: ...uick disconnect attached to the cable 3 Open the Rogowski coil by pinching the closing unit on the side of the connector and remove from the conductor 4 Position the new coil on the conductor such tha...

Страница 26: ...LLC Page 26 of 29 Dismantling The BGS32 contains components that may fall under local electronics disposal guidelines Please adhere to local requirements No lead is used in the BGS32 Emergency Measure...

Страница 27: ...based on customer provided information e g panel name etc E The radio zone that the meters in the BGS32 are set to F The location at which the wires will exit the BGS32 enclosure G The type of voltag...

Страница 28: ...Packet Power Multi Circuit Monitor BGS32 User Manual V2 0 2021 Packet Power LLC Page 28 of 29 C D E A B F G H I...

Страница 29: ...Packet Power Multi Circuit Monitor BGS32 User Manual V2 0 2021 Packet Power LLC Page 29 of 29...

Отзывы: