![Pacific Power Source UPC-32 Скачать руководство пользователя страница 103](http://html1.mh-extra.com/html/pacific-power-source/upc-32/upc-32_operation-manual_3149812103.webp)
SECTION 5
REMOTE OPERATION
93
5.7.3 EXAMPLE OF EXECUTING A STORED PROGRAM
Step A. Address the UPC as a listener
:PROGram:NAME 1
<eos>
Step B. Select Program 1
NOTE:
<eos> is a LINE FEED (0Ahex, 10dec)
:PROGram:EXECute
<eos>
Step C. Execute Program
Step D. Un-address UPC
5.7.4 EXAMPLE OF EXECUTING A STORED PROGRAM TRANSIENT
Step A. Address the UPC as a listener
:PROGram:NAME 1
<eos>
Step B. Select Program 1
NOTE:
<eos> is a LINE FEED (0Ahex, 10dec)
:PROGram:EXECute
<eos>
Step C. Execute Program
:PROGram:EXECute:TRANS
<eos>
Step D. Execute Transient
Step E. Un-address UPC
5.7.5 EXAMPLE OF DIRECTLY CHANGING THE OUTPUT PARAMETERS
Change Frequency and Volts for all phases then ENABLEs the OUTPUT
Step A. Address the UPC as a listener
:FREQuency 50
<eos>
Step B. Change Frequency to 50 Hz
:VOLTage 117
<eos>
Step C. Change Volts to 117 VAC RMS for all phases
:OUTPut ON
<eos>
Step D. ENABLE the OUTPUT.
The OUTPUT POWER switch must be in the ON/AUTO position
to allow power to be applied to the load
Step E. Un-address UPC
An alternative to steps B, C and D above is:
:FREQ 50; :VOLT 117; :OUT ON
<eos>
This example uses all shortform keywords in one Program
Message. The OUTPUT POWER switch must be in the
ON/AUTO position to allow power to be applied to the load
- and -
:OUTPut OFF
<eos>
Turns the output OFF
Содержание UPC-32
Страница 1: ...UPC 32 UPC 12 PROGRAMMABLE CONTROLLERS FIRMWARE V5 22 AND LATER OPERATION MANUAL PACIFIC POWER SOURCE...
Страница 2: ......
Страница 15: ...SECTION 1 GENERAL 5 PACIFIC Figure 1 3a SCU UPC 32 Figure 1 3b UPC 32 Figure 1 3c UPC 12...
Страница 40: ...SECTION 4 OPERATION 30 PA CIFIC FIGURE 4 1 POWER SOURCE FRONT PANEL...
Страница 127: ...NOTES 117 NOTES...
Страница 128: ...MODIFICATIONS 118 MODIFICATIONS MODIFICATIONS This section is reserved for any modifications that may be made...