
20
SQUEEGEE BLADES INSPECTION AND SELECTION
SQUEEGEE ASSEMBLY SETUP
Inspect and maintain the squeegee system to achieve peak machine performance.
REMOVAL AND INSTALLATION:
•
Install: Align the assembly, attach the vacuum hose, and tighten the easy grip knobs.
•
Remove: Loosen the easy-grip knobs and detach the recovery hose (reverse of installation).
SQUEEGEE USE:
1.
Lower: Lift the squeegee lever, shift it left, and lower. The vacuum motor will activate.
2.
Raise: Lift the lever and shift it right. The vacuum motor will run for 10 seconds to prevent recovered solution
from running back out of the hose.
HEIGHT ADJUSTMENT:
•
If the squeegee blade height requires adjustment, turn the button screws on the squeegee frame assembly
clockwise to raise and counter-clockwise to lower the wheels until proper blade deflection is achieved.
Proper blade
deflection
1/32”
clearance
Содержание S-28
Страница 56: ...BATTERYSHIELD OPTIONAL WIRING DIAGRAM 56 RETURN TO TABLE OF CONTENTS...
Страница 57: ...CHEMICAL INJECTION OPTIONAL WIRING DIAGRAM 57 RETURN TO TABLE OF CONTENTS...
Страница 58: ...58 MAINTENANCE LOG DATE MAINTENANCE PERFORMED RETURN TO TABLE OF CONTENTS...
Страница 60: ...60 http www pacificfloorcare com RETURN TO TABLE OF CONTENTS...