background image

PACIFIC FP30  190712-28 

13

Minimum Clearances to 

Combustibles

6 3/8"

6 3/8"

27 3/8"

30"

10"

9"

1"

FIG. #11

Содержание PACIFIC FP30

Страница 1: ...s Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S610 M87 AND UL 127 Meets the Environmental Protection...

Страница 2: ...Chimney Fires 4 In the event of a Chimney Fire 4 Avoiding a Chimney Fire 4 Operation 5 Wood Selection 5 How to Test Your Wood 5 Lighting for the First Time 5 Lighting a Fire 5 Normal Operation 5 Resta...

Страница 3: ...inspect seals and replace if necessary 7 DOOR GLASS Replacement glass can be obtained from your dealer Use 11 3 8 x 21 5 8 x 5 mm WARNING DO NOT SUBSTITUTE GLASS WITH ANY OTHER TYPE MATERIAL OTHER TH...

Страница 4: ...itable and must be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excess...

Страница 5: ...ss with several pieces of dry kindling Add a few small pieces of dry wood on top 3 Ignite the paper and close the door Depending on length of chimney installation you may need to leave door open appro...

Страница 6: ...wood will be producing 9375 BTU s per hour aver age 7500 BTU x 10 lbs 8hrs 9375 BTU s per hr If you put 20 lbs of wood in your stove for eight hour burn you will get 18 750BTU sperhr 7500BTUx20lbs 8hr...

Страница 7: ...Fig 2 3 3 Disconnect the wire lead of the blower from the electri cal terminal block and the male female connection to the Thermo Switch 4 Remove the two wingnuts securing the blower mounting bracket...

Страница 8: ...llation This package contains 19 full size firebricks as well as 3 various cut size bricks With the woodstove in the upright position install firebricks as follows 1 Place the firebricks on the bottom...

Страница 9: ...d choose a location where the chimney will pass through the house without cutting floor or roof joists OUTSIDE AIR INTAKE THIS LOCATION NOT RECOMMENDED THIS LOCATION OK RECOMMENDED LOCATIONS FIG 6 Che...

Страница 10: ...the label and in these installation instructions 2 Mark the position for the hole for the chimney in the ceiling and roof by using a string and plumb bob 3 Checkthattheintendedlocationwillnotinterfere...

Страница 11: ...190712 28 11 26 60 10 77 3 8 38 3 4 109 1 2 77 3 8 27 3 8 50 5 8 50 5 8 61 3 4 50 5 8 1 6 3 8 Minimum Framing Dimensions FIG 10 NOTE THE FRAMING DIMENSIONS AROUND THE FIREPLACE MUST INCLUDE THE INNER...

Страница 12: ...7747 FRAMING KIT LEG 3 1 2 L 3 Framing Kit Assembly 2 3 Each Kit Contains Assembly Lay out top bottom studs 2 and center studs 5 on a large flat surface Fig 9 Using the screws provided 1 attach the f...

Страница 13: ...PACIFIC FP30 190712 28 13 Minimum Clearances to Combustibles 6 3 8 6 3 8 27 3 8 30 10 9 1 FIG 11...

Страница 14: ...rk arrestor rain cap Radiation shield Chimney Support 38 5 978mm Minimum distance from unit to ceiling Minimum 7 2 1m Ceiling Height Non combustible floor protector The chimney may incorporate an offs...

Страница 15: ...s adapter and protruding through the roof Avoid having joints between ceiling and roof It is required to secure connections with three 3 12 mm metal screws 5 Installradiationshields firestopsandallpi...

Страница 16: ...rers installation instructions 3 Use another elbow to turn the chimney vertically Secure the elbow 4 Use a plumb bob to line up the centre of the hole Cut a hole for the chimney in the ceiling floor F...

Страница 17: ...otection as required Attach 4 venting not supplied to adapter WARNING This hole must get its air from the outdoors and be finished with an approved vent cap The use of outside combustion air for resid...

Страница 18: ...r the fireplace front and the other half must extend onto the floor and under the hearth extension ember protection as shown in Fig 18 Safety metal strip Cement Board 1 2 minimum if desired Hearth ext...

Страница 19: ...EMOTE GRAVITY HEAT DUCT KIT MUST BE INSTALLED WITH THE FP30 PART FP30 GVKIT INSTALLATION 1 Usingapairoftinsnips cutawaythesquaresectionblock ingtheheatductopeningsandcutoutinsulation Fig 20 2 Attach t...

Страница 20: ...opening in the wall outlet and secure to the outlet with two 8 X 1 2 Tek screws Cover with outlet screen provided or one of equal outlet area 6 Maintain clearances to combustibles as described in the...

Страница 21: ...of the dimensioned area shown by the dotted line in Fig 24 Use the manufactures suggested fasteners to attach the ce ment board and install as recommended Tape and mud the joints as per the board man...

Страница 22: ...EL DEPTH B 2 TO 12 MANTEL CLEARANCE CHART 16 1 2 NON COMBUSTIBLE FACING MATERIAL COVERING FROM THE CONVECTION AIR OUT LET TO THE CEILING NON COMBUSTIBLE ZONE DO NOT INSTALL ANY COMBUSTIBLE MATERIAL EL...

Страница 23: ...eosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t Burn Overnight 1 Ai...

Страница 24: ...f this design Traditional wood stoves had a basic combustion system which allowed a considerable amount of heat energy to escape up the chimney as unburned gases and particulates smoke Pacific Energy...

Страница 25: ...Baffle not sold separately SUMB BAFF 10b Side Insulation 5068 732 C 11 Brick Rails 2pc Required SUMM RAILSET 12 Baffle Pin SSER 125001 13 Baffle Gasket SUMB 31396 14 Flame Shield c w Bolt and Nut SUM...

Страница 26: ...26 PACIFIC FP30 190712 28...

Страница 27: ...ES SEE LOCAL BUILDING CODE AND MANUFACTURER S INSTRUCTIONS FOR PRECAUTIONS REQUIRED WHEN PASSING A CHIMNEY THROUGH A COMBUSTIBLE WALL OR CEILING CHIMNEY SYSTEM MUST BE LISTED TO IN CANADA USE ONLY ICC...

Страница 28: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: