**NOTE: go to section "Craftsman Surround
Installation" if you are installing the Craftsman
Surround Option.**
The front facing area of the FP30 can only be covered with
non-combustible
cement board prior to applying any finishing
materia
l (non-combustible only).
Use the Cement Board manufacturer's guidelines and
suggested fasteners to attach the cement board to the unit
and studs. Finish the joints as per the board manufacturer's
recommendations.
The front casing of the fireplace has a built in 1/2" (13mm)
deep facing edge/stop.
DO NOT EXTEND OR PLACE ANY CEMENT BOARD OR
FINISHING MATERIALS BEYOND/INSIDE THIS EDGE.
(Figure 30). Failure to comply will result in; overheating of
the fireplace and blowers, and will not be covered under
Warranty.
Finshing The Chase
Facing
Edge/Stop
Figure 30: FP30 Facing Edge stop.
Chase Air Inlets
THE CHASE ENCLOSURE MUST HAVE A MINIMUM 30in² (194 cm²) ROOM AIR INLET FOR EACH
REMOTE HEAT KIT INSTALLED ON THE FIREPLACE or IF THE CHASE HAS ANY VENTS OR OPENINGS
ABOVE THE HEIGHT OF THE DOOR.
If two heat kits are used the inlets can be combined, but it must be 60in² (387 cm
2
) or greater.
A chase air inlet is not required if a remote heat kit is not installed, but a single inlet is recommended for
efficiency.
The Chase Air Inlet(s) can be installed along the lower portion of the chase as long as they pull the air
from the room the fireplace is in. This will prevent reversal of flow if there are pressure differences in
the house.
The inlet can range from 1 1/2" (40mm) off of the floor to a maximum of 18" (460mm)
29
100000811_200418-48
FP30 Series B
Содержание FP30AR
Страница 47: ...47 100000811_200418 48 FP30 Series B...