Pacific energy B Series Скачать руководство пользователя страница 3

3

CAUTION

FOR YOUR SAFETY -

 Do not install or operate your Pacific Energy

Mirage Direct Vent without first reading and understanding this
manual.  Any installation or operational deviation from the following
instructions voids the Pacific Energy Gas Stove Warranty and may
prove hazardous.

This appliance and its individual shutoff valve must be disconnected
from gas supply piping system during any pressure testing of that
system at test pressures in excess of 1/2 psig. (3.5 kPa)

This appliance must be isolated from the gas supply piping system by
closing its individual manual shutoff valve during any pressure testing
of the gas supply piping system at test pressures equal to or less than
1/2 psig. (3.5 kPa)

Note:

  When lit for the first time,  the appliance will emit a slight odour

for a couple of hours.  This is due to the curing of paints, sealants and
lubricants in the manufacturing process.  This condition is temporary.
Open doors and windows to ventilate area.  Smoke and fumes caused
by the curing process may cause discomfort to some individuals.

SAFETY

Due to high temperatures, this gas appliance should be

located out of traffic and away from furniture and draperies.

Children and adults should be alerted to the hazards of high

surface temperatures and should stay away to avoid burns or
clothing ignition.

Young children should be carefully supervised when they

are in the same room as the appliance.

Clothing or other flammable material should not be placed

on or near the appliance.

Any grill, panel or door removed for servicing the unit must

be replaced prior to operating.  Failure to do so may create a
hazardous condition.

Installation and repair should be done by a qualified service

person.  The appliance should be inspected before use and at
least annually by a professional service person.  More frequent
cleaning may be required due to excessive lint from carpeting,
bedding material, etc.  It is imperative that control compart-
ments, burners and circulating air passageways of the appliance
be kept clean.

It is Pacific Energy’s policy that no responsibility is assumed by
the Company or by any of its employees or representatives for
any damages caused by an inoperable, inadequate, or unsafe
condition which is the result, either directly or indirectly, of any
improper operation or installation procedures.

MAINTENANCE

Caution:

  Turn off gas and electrical power supply and allow ample

time for unit to cool before servicing appliance.  It is recommended
that this appliance and venting should be inspected at least once a
year by a qualified service person.
Do not use this heater if any part has been under water. Immediately
call a qualified service technician to inspect the heater and to replace
any part of the control system or gas control which has been under
water.

Annual Inspection:

a)  Clean louvres and air passage ways of excessive lint build-up from
carpeting, bedding material, etc. The flow of ventilation air must not
be obstructed.

b)  Remove glass panel and log set.  Inspect logs and burner
assembly for lint and soot build-up.  If excessive build-up of soot is
present, have a qualified service person inspect and adjust unit for
proper combustion.  Clean logs and burner with a vacuum cleaner,
paying close attention to the ports on the burner.

c)  Check the pilot system for proper flame size and operation. Clean
pilot free of lint and dust (See Fig. #1).

d) Check that the vent pipe and vent terminal are open and free from
blockage or debris.

e)  Check glass panel gasket, replace if necessary.

Note: 

 The appliance area must be kept clear and free from combus-

tible materials, gasoline and other flammable vapours and liquids.

Periodically:

a) Viewing glass may be cleaned with glass cleaner.
b)  Exterior porcelain enamel finish may be cleaned with soap and
water.

Note:

  Never use abrasives to clean this appliance.

Fig. # 1

Содержание B Series

Страница 1: ...try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions...

Страница 2: ...ALLATION PRECAUTIONS 7 MANUFACTURED MOBILE HOME 7 STRAIGHT THROUGH WALL 8 CORNER INSTALLATION 9 BASEMENT INSTALLATION 11 FLOOR PROTECTION 11 VENT TERMINAL INSTALLATION 12 LOG SET 13 LIGHTING INSTRUCTI...

Страница 3: ...requent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compart ments burners and circulating air passageways of the appliance be kept...

Страница 4: ...x 3 Fasten in place with the 8 x 1 2 sheet metal screws provided Two screws at the top and three at the bottom of the valve assembly Fig 2 Caution Before making wiring connections ensure all power is...

Страница 5: ...5 Connect Here Fig 4 Fig 3 Optional Wall Switch or Wall thermostat Optional Blower Wiring...

Страница 6: ...Z 80 watts Fig 5 For your protection against shock hazard use only a properly grounded outlet that will accept a three pronged plug Do not cut or remove the grounding prong Consult local codes or in t...

Страница 7: ...er lag screws Consult local codes for approval INSTALLATION PRECAUTIONS The Mirage Gas Appliance installation and venting must con form to the current CAN CGA B149 installation code in Canada or the c...

Страница 8: ...arter pipe SK 18 may have to be cut to length depending on the wall thickness and or rear clearance of the stove Measure the wall thickness from the finished trim collar surface to the exterior mounti...

Страница 9: ...f the wall thimble with the screws provided 6 Attach the coaxial 45 elbow LB 45 to the unit Slide the 5 inch inner elbow pipe 1 inch over top of the collar and secure with three sheet metal screws Sea...

Страница 10: ...10 Fig 11...

Страница 11: ...components per the pre planned system configuration Support spacer must be used for each 6 feet of vertical and horizontal run The spacers are placed around the pipe and nailed or screwed to the fram...

Страница 12: ...nt pipe Attach backing plate to the outside wall with screws at each corner Fasten the vent pipe in place with sheet metal screws through the holes provided in the collar 2 Attach vent terminal box to...

Страница 13: ...t side facing rear and bark side forward 2 Place the front log on the tabs located at the front of the burner The log is notched to fit over top of the pilot 3 The top Y log bridges across from the fr...

Страница 14: ...ions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL...

Страница 15: ...ly depress and turn gas control knob clockwise past PILOT to OFF position DO NOT FORCE NOTE The SIT control has an interlock device which does not allow the pilot to be lit when the appliance is at op...

Страница 16: ...MFSD 1583_ _ 9 FRONT TRIM 2 pc required 1548 03 10 GLASS FRAME MFSD 1518 11 GLASS PANEL 2073 12 BURNER ASSEMBLY MFSD 1510 13 FLAME SHIELD MFSD 1564 14a PEDESTAL SIDE RIGHT 1545 5 14b PEDESTAL SIDE LE...

Страница 17: ...17 Fig 20...

Страница 18: ...18 NOTES...

Страница 19: ...local se conformer la norme CAN CGA B149 en vigueur MANUFACTURED MOBILE HOME FABRIQUEZ MOBILE MAISON May be installed in Manufactured Homes after the first sale See Instructions Pouvez tre install s d...

Страница 20: ...20 Pacific Energy Fireplace Products Ltd Box 1060 Duncan B C V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: