3. Place one full sized brick upright against each of the side walls (Figure 25).
4. Place one of two small (B) bricks on top of the brick which is up against the side wall (Figure 26).
Slide it towards the rear of the firebox so that it is partially behind the brick rail. Push it so that the
small brick is seated flat on top of the larger brick. If the small brick is pushed too far, it will ride
up onto another component located behind the brick rail, causing there to be a gap between the
small and large brick.
5. The four floor bricks consist of two different sizes. One (A) brick and one (D) brick (Figure 27)
should occupy each half of the floor space. After that, there is no particular order with which they
must be arranged.
Figure 25: Full sized brick (C) on side wall.
Small brick laying flat
on top of larger brick
Brick rail
Figure 26: Small (B) brick on top of large full sized
brick.
A
D
Figure 27: (A) and (D) bricks on firebox floor.
Figure 28: Firebrick placement complete.
210618-28_ALT 1.2
210618-28_ALT 1.2
23
5055.7298-A