background image

Reference this quick start guide to install and set up your new AIM Series Ozone Generator for service. 

Please refer to the full manual (available online at ozotech.com) for additional information including main-

tenance and operating conditions.

1) Unpack & Inspect Components - Unpack the ozone generator, parts and accessories, and 

     compare to this packing list:

OZONE GENERATOR

Quantity  

Item #  

 

Description - Use

(1)  

 

31334 or 31335  

1000 Mg/Hr or 2000 Mg/Hr AIM Series Ozone generator

(1 or 2)   

40155    

 

50mm x 22 inch glass “Cool Tube” Corona Discharge Cell

(1 or 2)   

44347-1  

 

AIM series “Cool Tube” spring tension retainer

(1)  

 

38001    

 

115V AC power cord with plug

(1)  

 

44073 & 44074   

Power cord gripper grommet and nut

(2)  

 

43230    

 

Spare Fuses—3.15 Amp, slow blow

ACCESSORIES

Quantity 

Item #  

 

Description - Use

(1)  

 

M43-31335  

 

User Manual

(1)  

 

T40-32001  

 

Venturi Install and Care Guide

(1)  

 

31011    

 

BF1 - Back Flow Prevention Device

(60”)    

44244-1  

 

Ozone Resistant 1/4” ID tubing

(24”)    

44141-1  

 

Ozone Resistant 3/8” ID tubing

(1)  

 

33258-01  

 

Accessory Hose Adapter Kit, as follows:

(4)  

 

44144    

 

#2 Snapper Clamp - use with 3/8” OD hose

(4)  

 

44134    

 

#4 Snapper Clamp - use with 7/16” OD hose

(4)  

 

44096    

 

#7 Snapper Clamp - use with 1/2” OD hose

(6)  

 

44071    

 

#10 Snapper Clamp - use with 9/16” OD hose

(2)  

 

44112    

 

#14 Snapper Clamp - use with 5/8” OD hose

(3”)  

 

44208    

 

Ozone Resistant 1/2” ID x 5/8” OD tubing - use to step up tube size

(3”)  

 

44095    

 

Ozone Resistant 3/8” ID x 1/2” OD tubing - use to step up tube size

(2”)  

 

44140    

 

Ozone Resistant 1/4” ID x 3/8” OD tubing - use to step up tube size

(2)  

 

46012    

 

Ozone Resistant Tubing Insert 1/4” - use with soft or thin wall tubing

(4)  

 

44249    

 

Ozone Resistant Hose Connector 1/4” to 1/4” barb

(1)  

 

44247    

 

Ozone Resistant Hose Connector 1/4” to 3/8” barb - use to step up tube size

(1)  

 

44248    

 

Ozone Resistant Hose Connector 3/8” to 1/2” barb - use to step up tube size

(2)  

 

47018-304  

 

Ozone Resistant Check Valve 1/4” barb

Quick Start Guide

AIM BTU 1000 & 2000 Ozone Generator

Содержание AIM BTU 1000

Страница 1: ...Care Guide 1 31011 BF1 Back Flow Prevention Device 60 44244 1 Ozone Resistant 1 4 ID tubing 24 44141 1 Ozone Resistant 3 8 ID tubing 1 33258 01 Accessory Hose Adapter Kit as follows 4 44144 2 Snapper Clamp use with 3 8 OD hose 4 44134 4 Snapper Clamp use with 7 16 OD hose 4 44096 7 Snapper Clamp use with 1 2 OD hose 6 44071 10 Snapper Clamp use with 9 16 OD hose 2 44112 14 Snapper Clamp use with 5...

Страница 2: ... the back panel as needed for custom installations See drawing at right for factory mounting hole spacing Handy Tip To better facilitate top lid removal space the unit out from the wall slightly about 1 8 and be sure to leave adequate clearance at the top to access and remove glass tubes 3 Electrical Connections The latest model of the AIM Series Ozone Generators are designed to accept either 115V...

Страница 3: ...ted to remove caps let them hang gently to the side Step 3 a Place tube holder spring tension retainer item 44347 1 into the bottom of each chamber Inspect placement to ensure spring retainer is not sideways or upside down Step 4 a Carefully insert a glass corona tube item 40155 into each chamber Ensure the brass electrode end is up towards cap end Step 5 a Reinstall caps onto manifold s making su...

Страница 4: ...ance Connect the feed gas supply to the inlet hose closest to the access door and connect ozone feed line to the outlet hose closest to back of chassis Turn on gas flow and fine tune the flow rate to suit your application by adjusting the flow meter knob on the front door of the AIM Series Ozone Generator Temporarily installing an inline or T branch manometer or other fine resolution pressure sens...

Отзывы: