
STITCH LINE
2
• Lift up on ARM JOINTS to partially raise the shelter.
(Detail 1)
• Extend TELESCOPING LEG POLES until SILVER BUTTONS “click” into the locked position.
(Detail 2)
NOTE:
You can now easily move your shelter to its final position before securing with stakes
and guylines.
NOTE:
See other side for securing detachable panel .
8FT X 8FT INSTANT SUN SHADE
• Stand shelter upright with HUB ASSEMBLY
at top.
• Unfold LEG POLES and
spread out shelter.
1
Setup Instructions:
WMT-8859
Model No. 30147
“Click”
2
Before you begin
Read all instructions thoroughly before beginning set up.
• Select a level site clear of rocks, branches, and other hard or sharp objects, to set up your tent.
WARNING:
Keep clear of overhead power lines.
• Do not set up your shelter under trees because of potential lightning strikes or falling tree limbs in
inclement weather.
• For best results in windy conditions, position narrow end of shelter into the wind.
• Secure with all stakes and guylines provided to prevent property damage or
personal injury.
• Two people can easily setup this shelter in 60 seconds or less.
Scan QR code to view
our setup video.
1
ARM
JOINT
To Secure Shelter:
Stake Shelter
• Locate WEBBING LOOPS sewn into the corners at the
base of your shelter.
• Slide STAKE through WEBBING LOOP at each location; then extend out before securing.
(Detail 3)
NOTE:
Floor of shelter should be taut when staked properly.
Secure Shelter Guylines
• Locate GUYLINES attached to the FRAME
• Slide STAKE through loop at each location, extend out and drive in to secure.
(Detail 4)
NOTE:
GUYLINES should extend out at a 45º angle from sheler.
• Tighten GUYLINES as needed by adjusting the SLIDER up the cord.
SLIDER
4
3
Parts List:
A (1)
Integrated Frame with Shade Body
E (1)
Carry Bag
D (1)
Stake Bag
C (8)
Stakes
B (1)
Detachable
Panel