PREPARING THE PRODUCT FOR INSTALLATION
3.1 Procedure for transporting the product to the installation site
The product in the original package can be transported without limiting the
range by air, closed motor road and rail transport provided it is protected against
direct exposure to precipitation and dust.
In order to avoid condensation of moisture after transportation at negative
temperatures, the product should be held in a room with normal climatic
conditions for 12 hours.
Loading and unloading operations should be carried out in compliance with
safety regulations.
3.2 Rules for unpacking the product
3.2.1
Perform visual inspection of the packaging. There should not be
visible damage on the package.
3.2.2
Open the transportation box, unpack and check completeness of
the product:
1)
turnstile post;
2)
CP with cable;
3)
base cover.
3.3 Rules for visual inspection of the product
3.3.1
Check completeness of the product.
Completeness
should
be
checked
according
to
the
VZR.247800.001Logbook (LB).