12
Version1.0 rev 18 Feb 2015
Rotr
SECTION 4. INSTALLATION
4.1. I
NSTALLING THE
R
OTR
F
ILTER
W
HEEL
WARNING
This product is supplied as part of a system, and must be installed by an Andor Installation
Technician or a trained Andor Systems distributor. The following is only provided to augment this.
4.1.1.
L
OCATION AND
M
OUNTING
•
Temperature and humidity must meet the specifications shown in; Section 7.2 Operating
Conditions
•
Operational vibrations should be eliminated. Ensure the stand is fully clamped to the optical
table, using 2 screws per clamp ring where possible.
•
Power cabling and control cables should be routed to prevent accidents, damage and
accidental unplugging.
Installation into a Revolution System by an Andor Installation Technician or trained Andor Systems
distributor will include the following steps:
1. Attach the Rotr to the CSU using 2 off M4 grub screws.
2. Attach the lens adapter to the Rotr adapter plate using 3 off M3 cap head screws.
3. Attach the camera adapter using 3 off M5 nylon tipped grub screws.