21
OXE 150/200 HP SERVICE MANUAL
SPECIFICATIONS
Application 150/200
Specification
Metric
Imperial
Piston Ring End Gap -
Oil Control Ring - @ 23 mm (0.905 in) down
0.25-0.50 mm
0.0098-0.0196 in
Piston Ring Groove Clearance -
First Compression Ring - Maximum
0.143 mm
0.0056 in
Piston Ring Groove Clearance - Second Compression Ring -
Maximum
0.073 mm
0.0028 in
Pistons and Pins
Piston Diameter Grade A
82.935 mm
3.2651 in
Piston Diameter Grade B
82.945 mm
3.2655 in
Piston Diameter Grade C
82.955 mm
3.2659 in
Piston Diameter Oversize
+0.1 mm
+0.0039 in
Piston - Piston Clearance to Block Bore -
90° to Piston Pin @ 10 mm (0.3937 in) up
0.60-0.80 mm
0.0236-0.0314 in
Pin - Piston Pin Clearance to Connecting Rod Bore -
Maximum
0.039 mm
0.0015 in
Piston - Piston Pin Clearance to Piston Pin Bore
0.005-0.015 mm
0.0002-0.0006 in
Connecting Rod
Connecting Rod Bearing Thickness (Red)
1.527-1.531 mm
0.06012- 0.06028 in
Connecting Rod Bearing Thickness (Blue)
1.530-1.534 mm
0.06024- 0.06039 in
Connecting Rod Bearing Thickness (Yellow)
1.533-1.537 mm
0.06035- 0.06051 in
Connecting Rod Bearing Thickness Oversize (Brown)
1.591-1.595 mm
0.06264- 0.06279 in
Connecting Rod Bearing Thickness Oversize (Green)
1.594-1.598 mm
0.06276-0.06291 in
Connecting Rod Bearing Thickness Oversize (Black)
1.597-1.601 mm
0.06287-0.06303 in
Cooling System
Coolant
Refer to Recommended fluids and grease
Capacity
Refer to Recommended fluids and grease
Thermostat
Start to Open
75°C
167°F
Fully Open
77°C
170°F
Содержание 30-0100-125
Страница 1: ...SERVICE MANUAL 1 0 Publication No ODM1004 DIESEL ENGINE ...
Страница 2: ...2 OXE 150 200 HP SERVICE MANUAL ...
Страница 4: ...4 OXE 150 200 HP SERVICE MANUAL ...
Страница 229: ...229 OXE 150 200 HP SERVICE MANUAL ELECTRICAL SYSTEM Rear view 1 Fasten and secure wiring with clips 1 ...
Страница 245: ...245 OXE 150 200 HP SERVICE MANUAL ELECTRICAL SYSTEM ...
Страница 258: ...258 OXE 150 200 HP SERVICE MANUAL ...
Страница 259: ...259 OXE 150 200 HP SERVICE MANUAL ...