Quick Start Guide
–1–
–2–
–3–
NEOs
™
T24
2U Tape Library
Step 1
It is
essential
that you activate your warranty. Technical and warranty support are
not available
until the warranty is active.
The serial number is located on the pull-out tab at the rear.
Enter only the core characters skipping the
parenthesis, “PN:”, and “SN:” components
.
Example: 11S00V7150Y1N1B78X9938
For an existing customer:
1.
http://support.overlandstorage.com/
support page.
2.
Enter your
e-mail address
and
password
in the
appropriate fields, and then press
Enter
or click
the right arrow (
>
).
3.
At the Support Home page, click
Register New
.
4.
Enter the requested information and click
Submit
.
Your warranty certificate will be emailed to you. Follow the instructions in the
email to complete the process.
For a new customer:
page and follow the instructions.
You’ll receive a confirmation e-mail from Overland with instructions on how to
complete the registration process.
Step 2
WARNING:
Due to the weight of the appliance, it is recommended that at least two
people be used to lift the unit out of the box to prevent injury.
WARNUNG:
Um Verletzungen zu vermeiden, empfehlen wir aufgrund des Gewichts
des Geräts, dass mindestens zwei Personen das Gerät aus der Verpackung heben.
AVERTISSEMENT:
En raison du poids de l'appareil, il est recommande d'utiliser deux
personnes au moins pour soulever l'appareil hors de la boîte pour éviter les blessures.
IMPORTANT: The shipping lock, which prevents the library accessor from moving during
shipment, must be removed before the library is powered ON.
NOTE: If the temperature in the room where the library will be installed varies by 15º C
(30º F) from the room where the library was stored, allow the library to acclimate to the
surrounding environment for at least 12 hours before unpacking it.
The shipping lock is held in place with a label and is
located in the top center of the library. After the
shipping lock is removed, store it on the right side of
the back panel for future use.
1.
Using two people, remove the
library
from its
box and set it on a secure surface.
2.
Remove blue securing
label
( ).
3.
Lift and remove the
shipping lock
( ).
4.
Store the shipping lock and blue label at the top
right ( ) of the rear panel of the library.
Slide the lock into the slot with the bottom of the
lock showing below the slot. Press the label over
the flat part of the lock.
Step 3
The NEOs T24 libraries each come with a rack shelf kit for easy installation and
securing of the library into a 19-inch (EIA-310) rack.
IMPORTANT: Two-post telco-style or other racks less than 29 inches in depth will NOT
support this unit.
WARNING:
It is recommended that a mechanical lifter (or at least two people) be
used to raise and align the unit to prevent injury during installation. Use care when
inserting or removing a unit into or out of a rack to prevent the accidental tipping of
the rack, causing damage or personal injury.
WARNUNG:
Um Verletzungen zu vermeiden, empfehlen wir zur Rack-Installation oder
-Deinstallation die Nutzung einer mechanischen Hebehilfe (oder mindestens zwei
Personen). Seien Sie vorsichtig bei der Rack-Installation oder -Entnahme, um ein
versehentliches Kippen des Racks zu vermeiden und das Rack nicht zu beschädigen
bzw. sich selbst zu verletzen.
AVERTISSEMENT:
Afin d’éviter des blessures pendant l’installation, il est
recommande d’utiliser un monte-charge (ou au moins deux personnes) pour élever ou
aligner l’appareil. Faites attention lorsque vous insérez ou retirez l’appareil d’un
support, pour empêcher le déversement accidentel de la crémaillère causant des
dommages et des blessures.
Install the Rack Rails
&
Two EIA units (2U) needed
for the rail kit installation
Wide Gaps between EIA
unit holes
Narrow Gaps between EIA
units holes
2U (3.5 in.)
Square-hole Rack
Round-hole Rack
1.
Determine the location in your rack for your library to be installed and, using a
pencil, mark the location on each vertical rail in your rack, front and rear.
NOTE: A 2U library requires 2U (3.5 in.) of rack space. A 4U library requires 4U (7 in.) of
rack space. Both units use the same rail kit.
2.
Ensuring that the shelf flange on each rail points toward the rack center to form a
shelf, secure one rail to
each side
of the rack at the bottom of your chosen rack
location.
NOTE: The rail kit front and rear end brackets should face outward. The rails must be
fastened with the bottom of the shelf flanges parallel to floor and at the same level.
a. Extend
the rails
to fit your particular rack depth.
Align the rail kit brackets at the bottom of the 2U space. The extension sections
should be at the rear.
b.
Using either the square-hole or round-hole
eight screws
, secure the front and
back of each rail to the rack.
The screws go into the holes with the wide gaps above and below them.
Attach the Rail Brackets to Library
NOTE: The rail brackets attach at the bottom on both the T24 and the T48 libraries.
1.
Position the
right bracket
on the right side with the notch in the library indent
at the bottom and the two-holed flange to the front.
2.
Use the
flat-head screw
in the top hole.
3.
Use the
round-head screw
in the bottom hole.
4.
Repeat these steps for the
left bracket
.
Insert the Library in Rack
1.
Using the mechanical lifter, position the
library
in front of the rack, aligned with
and slightly above the shelf flanges.
2.
Slide the library onto the
shelves
until the mounting brackets are up against the
vertical rack rails.
3.
Secure it to the rack with the
two provided screws
.
Front View
Rear View
Extension Section
*10400894*
10400894