D-160TS-7-E
4
1. BEFORE YOU BEGIN
1.1 Confirming the Specifications
(
1
)
Once the flowmeter is received, inspect its appearance and confirm that it is not damaged during
transit.
(
2
)
Product code and specifications are indicated in the nameplate of the flowmeter. Make sure that
information on the nameplate conforms to your particular specifications.
(
3
)
This section describes the handling precautions. Read this section thoroughly. If at any time in the
future you seek our assistance, contact the nearest sales office in your area.
When you inquire, specify the product name, model number, serial number,
ratings/specifications and other information.
CAUTION:
1.2 Transit Considerations
(
1
)
It is desirable that the meter be transported to the installation site in the shipping container used for
transit from the factory.
(
2
)
During transportation, exercise care to avoid impact shock and rainwater.
1.3 Storage Considerations
If the flowmeter is to be stored over an extended period of time before installation, it could be involved
in unexpected happenings. So if an extended period of storage is anticipated, the following precautions
should be taken:
(
1
)
The meter can best be stored in the shipping container used for transit from the factory.
(
2
)
The place of storage should meet the following requirements:
・
Free from rain and water
・
Free from vibration and impact shocks
・
With least temperature and humidity variation (around 25
℃
and 65% R.H.)
(
3
)
A meter that has once been placed in service for any length of time should be washed clean to
remove residue metered material completely from its inner walls before storage. Waterproofing the
wiring entrance should also be taken into consideration.
Unauthorized modification will invalidate the specifications.
CAUTION: