background image

  

    Last Update: 2011-June                INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS     

  1/35 

©TANSUG MAKİNA LTD. 2008

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TECHNICAL MANUAL FOR 
THERMOSYPHONIC SYSTEMS

 

 
 
 
 

 

  

 

 

 
 
 
 
 
 
 
 
 

“CLOSEST TO THE SUN” 

 

SOLAR THERMAL SYSTEMS 

Содержание ASSET 191

Страница 1: ...Last Update 2011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 1 35 TANSUG MAK NA LTD 2008 TECHNICAL MANUAL FOR THERMOSYPHONIC SYSTEMS CLOSEST TO THE SUN SOLAR THERMAL SYSTEMS...

Страница 2: ...ROOF TOP STAND 17 6 1 Compatibility 17 6 2 List of Components used in the structures 17 6 3 Description of screws that are used in the mounting of the stands 18 6 4 Assembly of Thermosyphonic Flat Ro...

Страница 3: ...the system and ensure that they receive maximum benefit from their OURASET systems throughout its life time by carrying out correct maintenance The manual consists of two chapters Chapter 1 focuses o...

Страница 4: ...S 4 35 TANSUG MAK NA LTD 2008 2 COMPONENTS AND PHYSICAL CHARACTERISTICS Thermosyphonic Systems at a glance Capacity is estimated based on average daily hot water generation capacity calculated on the...

Страница 5: ...L kg Close Open P 121 500 X 1200 58 0 1945x1200 1 40 5 27 125 0 252 0 P 151 600 X 1000 66 5 53 0 1945x1200 1 40 5 27 134 0 284 0 P 191 600 X 1200 73 7 62 0 1945x1200 1 40 5 27 141 2 331 2 P 192 600 X...

Страница 6: ...Sides 20 mm glasswool with glass tissue Sides 20 mm glasswool with glass tissue Conductor Copper absorbers welded to copper tubes by ultrasonic welding method Absorber Coating Highly selective blue sp...

Страница 7: ...HONIC SYSTEMS 7 35 TANSUG MAK NA LTD 2008 Test Report for AA 1200 by CENER under SOLAR KEYMARK Scheme Test Report and efficency curve for AA 950 by CENER under SOLAR KEYMARK Scheme Test Report and eff...

Страница 8: ...tubes 3 22 Copper tube header manifold 4 Hexagonal brass union 5 Insulation 50mm Rock wool W m C 0 055 AA Glasswool W m C 0 036 AES 6 Glasswool insulation 20mm 7 Glass sealing rubber U Type 8 Manifold...

Страница 9: ...se Colorcoated galvanized steel coated with transparent folio for protection during transport Caps UV Proof ABS plastic Diameter mm 500 mm 600 mm 600 mm 600 mm Length L mm 1200 mm 1000 mm 1500 mm 1800...

Страница 10: ...p CL P 190M CL P 300M CL DESCRIPTION NOZZLE Cold water inlet N1 3 4 Hot Water Outlet N2 3 4 Solar Collector Outlet N3 3 4 Return to Collector N4 3 4 Expansion Tank Kit Connection N5 3 4 Air Vent N6 3...

Страница 11: ...CL P 190S OL P 300S CL P 300S OL OPEN LOOP CLOSE LOOP DESCRIPTION NOZZLE Cold water inlet N1 3 4 Hot Water Outlet N2 3 4 Solar Collector Inlet N3 3 4 Solar Collector Outlet N4 3 4 Expansion Kit Inlet...

Страница 12: ...0 076 m 3 Manometer Pakkens 0 6 bar G B EN 837 Plastic Body Electrical Element Thermostat Thermowatt 2 kw copper resistance See section 8 for details Pressure Relief Valve Watts 3 bar PN 10 bar T 10...

Страница 13: ...e to the consumption point 3 5 You may need the following tools and devices for the installation of your OURASET system a Small crane for the lift of panels and stand on the roof b Safety equipments h...

Страница 14: ...plying to this rule a discrepancy of plus or minus 15 degrees is acceptable Decreasing the angle will increase the summer time energy output while increasing will increase the winter time energy outpu...

Страница 15: ...1 captador Sistemas de 2 captadores Cantidad Cantidad 1 Ouraset Collector 1 2 2 Ouraset Tank 1 1 3 Blind Plug 3 5 4 Security valve 3 bar female 1 1 5 Security Group 6 bar 1 1 6 Elbow MM 2 1 7 Adapter...

Страница 16: ...Last Update 2011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 16 35 TANSUG MAK NA LTD 2008 5 2Installation of Double Panel Systems...

Страница 17: ...mm 2 3 2 2 B45 VERTICAL FRAME 1415 mm 2 2 C35 SIDE FRAME 780 mm 2 3 2 2 2 2 C45 SIDE FRAME 585 mm 2 2 D1 ALUM PANEL FRAME 1000 mm 2 2 2 D2 ALUM PANEL FRAME 2000 mm 2 2 2 2 2 D3 ALUM PANEL FRAME 3000...

Страница 18: ...21 151 191 when connecting the back diagonals See Figure A Use the holes on the vertical frames B that correspond to this distance between the two legs 6 4 4 The distance between the center of tank be...

Страница 19: ...structure aside and drill the holes on the roof and insert plugs and nuts Anchor the ground supports I on the roof 6 4 9 Move the structure on top of the ground supports D Install the ground supports...

Страница 20: ...Last Update 2011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 20 35 TANSUG MAK NA LTD 2008 235 mm FIGURE A TFR45 1 T Syphonic flat Roof Structure for 1 Panel 515 mm 45 210 mm 880 mm 235 mm...

Страница 21: ...Last Update 2011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 21 35 TANSUG MAK NA LTD 2008 515 mm 45 210 mm FIGURE B TFR45 2 T Syphonic Flat Roof Structure for 2 Panels 235 mm...

Страница 22: ...f installations The assembly is very similar with a small difference which is illustrated at Figure E F 6 5 1 Put the base frame A and the side frame C together to form one straight frame as seen on F...

Страница 23: ...rst the top aluminum frame D as illustrated at Figure E Then put the bottom aluminum panel frame D on the corresponding hole as shown in the Figure It is crucial that you measure exactly 1950 mm betwe...

Страница 24: ...hors in a way that one pair is at the bottom and the other two pairs are closer to the top 6 5 8 Put the structure aside and drill the holes on the roof and insert plugs and nuts Anchor the roof suppo...

Страница 25: ...011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 25 35 TANSUG MAK NA LTD 2008 FIGURE F Connection Details for Inclined Roof Assembly Using C35 FIGURE E Connection Details for Inclined Roof Assem...

Страница 26: ...supported levels Examples of this are the galvanized steel pipes that should not undertake more than 55 degrees 5 1 4 All the pipes enduring hot water circulation should be insulated with minimum 20m...

Страница 27: ...h test once temperature therefore pressure rises 6 ELECTRICAL ELEMENT 6 1 Your thermosyphonic system can be incorporated with an optional electrical heater of 2000 W to be used as an auxiliary heating...

Страница 28: ...d to the requested temperature Remember that setting a high temperature on the thermostat can mean the use of your electrical heater for longer time thereby consuming high levels of electricity It is...

Страница 29: ...RUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 29 35 TANSUG MAK NA LTD 2008 Connect the grounding line on the cable Screw the heater cap on the tank Then connect the negative and positive poles to the resp...

Страница 30: ...ircuit of your system to provide better heat transfer at the same time protecting your system from corrosion and frost 11 DISCHARGING THE SYSTEM 11 1 Discharging the secondary circuit Rotate the press...

Страница 31: ...must also installed by your authorized installer 12 1 Primary Circuit Closed Loop Line Expansion tank preset 1 5 bar working pressure 4 bar Pressure relief valve 5 bar Air vent 160 C 12 2 Secondary Ci...

Страница 32: ...Decrease of fluid in the close loop of the system may cause dramatic decrease in the performance of the tank When the anti freeze fluid is inadequate in the system it can also result in the freezing...

Страница 33: ...luid Too many curves on the piping line dramatically decreases the performance of your system Check if possible air loops occurred inside your boiler or collector during charging of your system 4 Chec...

Страница 34: ...Last Update 2011 June INSTRUCTION MANUAL FOR THERMOSYPHONIC SYSTEMS 34 35 TANSUG MAK NA LTD 2008 ANNEX 1 PARALLEL CONNECTION OF MULTIPLE SYSTEMS ANNEX 2 SERIAL CONNECTION OF MULTIPLE SYSTEMS...

Страница 35: ...FOR THERMOSYPHONIC SYSTEMS 35 35 TANSUG MAK NA LTD 2008 CONTACT DETAILS TANSU MAK NA INDUSTRIAL FACILITIES ADANA CEYHAN YOLU 10 KM 01340 INCIRLIK ADANA TURKEY 90 322 3464900 90 322 3465008 info ourase...

Отзывы: