Ones Stop Systems
EB7-X8G2-RAS | 9
APPENDIX B I/O Switching Via SNMP
70
In the next image note the status of the two servers indicating which physical fiber link currently has all the I/Os:
Step 6: Switch all I/Os to server 2, the secondary server, by clicking the button “Switch All I/O Ports >>” in the web interface. You will be
directed to a temporary waiting page that looks like this:
After 10 seconds or so, the page will automatically change back to the I/O Failover tab, where you should be able to note that the I/Os have
been switched to Server 2: