One Stop Systems
EB4400 (5-SLOT BP)
31
8
Powering UP the Computer
Before powering UP or turning ON the Host computer, make sure the Host adapter card is seated properly in a x16 Gen3 / Gen4 PCIe slot and
the cables are firmly connected. Upon powering up the Host computer, it will initialize a link between the target and the host. The Link LED on
both target and host cards will illuminate as solid green.
Solid green Link LED, it means the negotiated link width between host and target card is x16.
Blinking green Link LED, the link width is x8
Содержание EB4400 5-SLOT Gen4
Страница 1: ...INSTALLATION GUIDE EB4400 5 SLOT GEN4 EB4400 5 SLOT Gen4 www onestopsystems com ...
Страница 7: ...One Stop Systems EB4400 5 SLOT BP 7 1 5 Backplane Block Diagram ...
Страница 8: ...One Stop Systems EB4400 5 SLOT BP 8 1 6 Dimensions ...
Страница 9: ...One Stop Systems EB4400 5 SLOT BP 9 1 7 Parts Overview ...
Страница 10: ...One Stop Systems EB4400 5 SLOT BP 10 ...
Страница 20: ...One Stop Systems EB4400 5 SLOT BP 20 4 4 Dip switch Settings ...
Страница 56: ...One Stop Systems EB4400 5 SLOT BP 56 14 9 2 LED Indicator ...
Страница 62: ...One Stop Systems EB4400 5 SLOT BP 62 6 2 pin aux power cable and pin outs ...
Страница 70: ...One Stop Systems EB4400 5 SLOT BP 70 ...