SECTION 4 - MACHINE OPERATION
31215048
4-19
4.14 SHUT DOWN AND PARK
To shut down and park the machine, the procedures are as fol
-
lows:
1.
Drive machine to a reasonably well protected area.
2.
Ensure boom is fully retracted and lowered over rear axle.
3.
Shut down Emergency Stop at Platform Controls.
4.
Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center Off (center posi
-
tion).
5.
If necessary, cover Platform Controls to protect instruction
placards, warning decals, and operating controls from hos
-
tile environment.
IF PARKING A MEWP WITH THE BOOM ELEVATED IN AN EFFORT TO CONSERVE SPACE,
BOOMS MAY BE ELEVATED, BUT SHALL NOT BE EXTENDED. IT IS THE OPERATOR’S
RESPONSIBILITY TO ENSURE ALL SAFETY PRECAUTIONS IN SECTION 1 OF THIS MAN
-
UAL ARE FOLLOWED FOR EACH UNIQUE SITUATION.
4.15 LIFTING AND TIE DOWN
Lifting
1.
Call JLG Industries or weigh the individual unit to find out
the Gross Vehicle Weight.
2.
Place the boom in the stowed position with the turntable
locked.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
To
order go
to
Discount-Equipment.com