SECTION 3 - MACHINE CONTROLS, INDICATORS, AND OPERATION
31217186
3-19
3.13 PLATFORM RAILS FOLD-DOWN PROCEDURE (IF EQUIPPED)
Platform with Dual Rail Extension Deck
ONLY FOLD DOWN THE RAILS WHEN THE MACHINE IS IN THE STOWED (PLATFORM
FULLY LOWERED) POSITION. DO NOT RAISE THE PLATFORM WITH THE RAILS FOLDED
DOWN. THE RAILS MUST BE IN THE UPRIGHT POSITION AND PROPERLY PINNED
WHEN RAISING THE PLATFORM.
1.
Remove platform control box and place on platform deck.
2.
Remove two pins at the top front rails, then fold down the
front rail panel to the platform floor.
3.
Fold down inner extension rails to the platform floor.
Remove rail pin at top rear rail and fold in against the right
side top rail.
4.
Fold down outer platform rails towards the platform floor.
To raise rails back to the upright position, unfold the rails in the reverse
sequence they were folded and replace the rail pins into the rails.
AFTER THE RAILS HAVE BEEN FOLDED DOWN, USE EXTREME CAUTION WHEN EXITING
AND ENTERING THE PLATFORM. ENTER AND EXIT PLATFORM ONLY AT THE GATE AREA
AND LADDER PROVIDED.
IF DRIVING MACHINE WITH THE PLATFORM CONTROL STATION FROM GROUND, DO
NOT HANG THE CONTROL BOX ON ANY PART OF THE MACHINE WHILE DRIVING. HOLD
THE CONTROL BOX AND KEEP AT LEAST 3 FT (1 M) DISTANCE FROM MACHINE.
0"%
Содержание JLG ES1330L
Страница 6: ...REVISION LOG d 31217186 REVISION LOG Original Issue A January 31 2020 Revised B May 26 2020...
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 12 31217186 NOTES...
Страница 32: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 10 31217186 NOTES...
Страница 48: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 16 31217186 3 10 GRADE AND SIDESLOPE 7 0...
Страница 54: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 22 31217186 0...
Страница 56: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 24 31217186 NOTES...
Страница 60: ...SECTION 4 EMERGENCY PROCEDURES 4 4 31217186 NOTES...
Страница 66: ...SECTION 5 ACCESSORIES 5 6 31217186 NOTES...
Страница 81: ...SECTION 6 OPERATION SPECIFICATIONS AND MAINTENANCE 31217186 6 15 6 6 DECAL INSTALLATION 0...
Страница 83: ...SECTION 6 OPERATION SPECIFICATIONS AND MAINTENANCE 31217186 6 17 0 1 ANSI CE Japan AUS 2 China 3 Korea CSA...
Страница 94: ...SECTION 6 OPERATION SPECIFICATIONS AND MAINTENANCE 6 28 31217186 NOTES...
Страница 96: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 31217186 DATE COMMENTS...
Страница 97: ......