SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121214
– JLG Lift –
2-11
12. Hydraulic Pump and Reservoir
- See Inspection
Note. Recommended hydraulic fluid level on sight
gage (system shut down, boom in stowed position).
Breather cap secure and working.
13. Cowling and Latches
- All cowling, doors and latches
in working condition; See Inspection Note.
14. Tie Rod Ends and Steering Spindles
- See Inspection
Note. Tie rod end stubs locked.
15. Frame
- See Inspection Note. No evidence of cables
dragging under the machine.
16. Counterweight
- See Inspection Note.
17. Swing Motor and Worm Gear
- See Inspection Note;
evidence of proper lubrication.
18. Battery Charger
- See Inspection Note.
19. Control Valve
- See Inspection Note.
20. Manual Descent Valve
- See Inspection Note.
21. Jib
(E300 AJ only) - See Inspection Note.
Figure 2-6. Daily Walk-Around Inspection - Sheet 3 of 3
Property of American Airlines
Содержание JLG E300A
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 78: ...SECTION 4 MACHINE OPERATION 4 32 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 82: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 99: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...