SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-6
– JLG Lift –
3121214
SEE DETAIL A
DETAIL A
Figure 2-1. Boom Cutout Switches
UPPER BOOM ANGLE TO BE 1° BELOW HORIZONTAL TO 3°
ABOVE HORIZONTAL TO ACTIVATE SWITCH. UPPER BOOM
ANGLE TO BE 1° TO 4° BELOW HORIZONTAL TO RESET SWITCH.
LOWER BOOM ANGLE TO BE 1° TO 5° ABOVE
HORIZONTAL TO ACTIVATE SWITCH. LOWER
BOOM ANGLE TO BE 0° TO 5° BELOW
HORIZONTAL TO RESET SWITCH.
Property of American Airlines
Содержание JLG E300A
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 78: ...SECTION 4 MACHINE OPERATION 4 32 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 82: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121214 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 99: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...