
SECTION 5 - GENERAL SPECIFICATIONS
5-4
31215862
5.3 OPERATOR MAINTENANCE
Accessing Hydraulic/Electrical Components In Base Frame
1.
Raise the platform an inch or two to set the rear wheel
brake bar. Engage the front wheel castor locks.
CAUTION
WHEN REMOVING THE BASE FRAME COVER FOR MAINTENANCE PURPOSES,
FIRST SWITCH MACHINE POWER OFF BY DEPRESSING THE EMERGENCY STOP
BUTTON LOCATED ON THE BASE OF THE MACHINE. USE APPROPRIATE
SAFETY/PERSONAL PROTECTIVE EQUIPMENT WHERE NECESSARY.
2.
Lift the platform release latch on the right side of the
mast while swinging the platform forward.
3.
Tilt the platform up by lifting from gate end. The gas
strut mounted on the left of the platform will assist
with platform movement.
4.
When fully extended, check that the catch mechanism
on the gas strut is set and platform is locked in posi
-
tion before working beneath the platform.
5.
On the base frame, unscrew the black retaining knobs
attaching the frame cover to the base frame. Lift cover
off frame.
6.
After maintenance is completed, reassemble frame
cover on the base frame in reverse order starting at
step 4 above. Release gas strut and lower platform.
1.
Platform: Maintenance Position
2.
Gas Strut with Catch Mechanism
3.
Platform Latch Lock Pin
4.
Base Frame Cover with Screws
1
2
3
4
To
order
go
to
Discount-Equipment.com
Содержание JLG 830P
Страница 20: ...SECTION 1 SAFETY PRECAUTIONS 1 12 31215862 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 43: ...SECTION 3 MACHINE OPERATION 3 14 31215862 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 56: ...T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...