background image

 

 

 

 

 

Assembly Instructions 

 

ORTNER SE9 73/46/38 L

 

Manual and automatic operation 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

A sufficient quantity of combustion air must be provided (calculation is required). Use 

caution in regard to the utilisation of ventilation systems, fume hoods, etc.! 

 

To avoid any errors, please first carefully read our assembly instructions! 

 

The respective national or local regulations and general provisions, stipulations and 

codes of practice must be complied with! 

 

CAUTION: Due to the thermal expansion of the door unit, a space of at least  

4 mm must be provided all around the mounting frame and the stove shell. The 

space must be filled with a soft sealing strip. 

 

Version: 11_2017 

Содержание SE9 38 L

Страница 1: ...me hoods etc To avoid any errors please first carefully read our assembly instructions The respective national or local regulations and general provisions stipulations and codes of practice must be complied with CAUTION Due to the thermal expansion of the door unit a space of at least 4 mm must be provided all around the mounting frame and the stove shell The space must be filled with a soft seali...

Страница 2: ...1 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at ...

Страница 3: ...ired for the assembly of the Ortner storage corner 3 Technical specifications 3 Important information before the installation 4 Initial steps 5 Technical dimensioned drawing 11 General information 11 Fire and heat protection 13 General 13 Mounting surfaces TO BE PROTECTED 13 Mounting surfaces NOT TO BE PROTECTED 13 General 14 Schematic sketch 15 Exploded view 17 ...

Страница 4: ...er Technical specifications When used with the KMS Type designation SE9 73 46 38 L Heat output in regard to the storage duration of 12 h with ceramic flue gas tubes KMS 300 or chamotte flue 2 4 kW Rated heat output in relation to the combustion duration 29 8 kW Max wood amount 9 kg Total mass without ceramic hot gas flues approx 399 kg Degree of efficiency 80 Stack gas mass flow 28 g s Minimum dis...

Страница 5: ...ved in the event of manual operation in regard to its function and ease of operation Check all screws on the frame and retighten if necessary Shell components red must always be made gastight with Ortner bedding mortar HK Refractory concrete parts grey are always installed dry no bonding In this manner they can always be replaced via the door All grey refractory concrete parts have already been cu...

Страница 6: ...ovided fibre strips on the connection points between metal and ceramic Set up the base frame level the bottom part and if necessary connect the aluminium flexible hose for the combustion air supply Loosen the screws of the metal strips on the frame contact surface with jacket components and on the tabs on the base frame Initial steps ...

Страница 7: ...r HK Now press the bottom clamping strip against the jacket bricks and secure these with the screws Now align the 1st row horizontally and vertically Then place the remaining jacket parts together on top of each other with bedding mortar HK joint thickness approx 3 mm Be careful not to close off or contaminate the inlet air gap on the base frame with bedding mortar HK SE9Ha GOA 5 SE9Ha 3 1 SE9Ha 2...

Страница 8: ...rtner cc at www ortner cc at Insert the first two rows of GOS in the combustion chamber No bond is created in the course of this The designation of the bricks relates to the number of segments Place the base plates and the ash bricks in the combustion chamber do not bond GOS6 GOS6 GOS12 GOS12 ...

Страница 9: ...ced in the top row Joint pattern GOS An OPEN joint must be created after the 2nd 3rd and 4th row GOS Install the parts of the post combustion chamber dry In the event of joints that have not been closed depending on the joint thickness when erecting the red jacket bricks the joints must be sealed with ceramic fibre However the parts of the post combustion chamber should not be bonded with each oth...

Страница 10: ...l 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Position the deflection plate on the GOS and always slide this to the very back and to the side of the burn out Now position the cover of the post combustion chamber SE1 6 3 GO1 7 GO4 1 ...

Страница 11: ...754 2708 office ortner cc at www ortner cc at Bond the cover of the jacket with the side parts Use ORTNER bedding mortar HK for this task Caution The minimum distance between the cover of the post combustion chamber and the jacket cover must be at least 12 mm GOA 8 SE9Hc GOA 5 ...

Страница 12: ... 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Technical dimensioned drawing applies to both automatic as well as manual operation The base frame can be adjusted downwards by 60 mm Position of adjustable feet Combustion air connection ...

Страница 13: ... of 80 cm to the firebox door radiation range Attention must be paid in regard to the installation surface that no combustible materials are located to the side or behind the stove at a distance of 20 cm Additionally the ground must have sufficient loading capacity and must be incombustible The installation of firing installations is only permitted at those locations in which a sufficient loading ...

Страница 14: ...tection must be implemented as follows Electrical installations and or electrical components on the side facing the stove Construction of the insulation just as the mounting surfaces TO BE PROTECTED Electrical installations and or electrical components on the rear of the mounting wall wall thickness greater than 12 5 cm and mounting wall detached at the rear Construction of the installation just l...

Страница 15: ...the stove made of combustible materials then it must be protected with a coating made of incombustible material e g sheet metal from the firebox opening forwards at least 30 cm and at least 10 cm to the side 5 When containers drawers etc are to be integrated in the firing installation then it must be prevented that embers or burning material can fall into them from the firebox Furthermore temperat...

Страница 16: ...15 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Schematic sketch ...

Страница 17: ... when the covering is attached upwards to the ceiling then insulation is required The heat insulation can either be performed with the reference insulation material or a substitute insulation material In the event of a non insulated heating chamber ceiling the distance between the upper edge of the firebox and the heating chamber ceiling must be at least 10 cm 7 Covering 8 BIS bricks For the insul...

Страница 18: ...17 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Exploded view ...

Отзывы: