16
Firebox Clearance Diagrams
This manual is based on installation of front-facing ORTAL fireplaces. To install other ORTAL fireplace styles,
modify the instructions per ORTAL Framing Dimensions.
Maintain clearances as shown in the figures below. Clearances are to non-combustible materials, or 16mm
Gyprock Fyrchek fire rated drywall or its equivalent.
The legend for the figures is provided in the following table:
16mm Gyprock Fyrchek fire rated gypsum board
Section cut
Wood
Combustible material
Non-combustible material
Wood framing
Metal framing
FRONT/TRADITIONAL
TUNNEL (SEE-THRU)
Содержание Clear 200
Страница 1: ...Installation and Operation Manual AU NZ For 150 250 Units ORTAL Heating Systems Ltd ...
Страница 17: ...17 LEFT SIDE OPEN LS RIGHT SIDE OPEN RS THREE SIDES TS ...
Страница 21: ...21 Figure 3 Concrete Wall Mounting Detail ...
Страница 23: ...23 Figure 4 Wood Stud Mounting Detail ...
Страница 43: ...43 Figure 12 Exploded View of Pilot Parts Receiver and Gas Valve ...
Страница 55: ...55 Figure 12 Exploded View of Pilot Parts Receiver and Gas Valve ...
Страница 77: ...77 Flue Termination Drawings Flue Terminations ...
Страница 89: ...89 Pull the suction cup to take the glass out NOTE Repeat this process to remove the side glass ...
Страница 102: ...102 Pull the framed screen down and out and remove it ...
Страница 120: ...120 6 Push the right and left floor bricks into place as shown ...
Страница 125: ...125 ...
Страница 135: ...135 ORTAL Product Service Log ...
Страница 136: ...136 Manufacturer Contact Information For all service issues please contact your local dealer ...
Страница 146: ...146 Troubleshooting Beeping ...
Страница 147: ...147 ...
Страница 148: ...148 Mertix Maxitrol External Source Operation The following figure is taken from the Mertix Maxitrol guide ...
Страница 154: ...154 Pull the base until it releases Tilt the base as shown in the figure below ...
Страница 155: ...155 Pull the base out as shown ...
Страница 156: ... Ortal 2018 Rev 3 0 October 2018 KPMANUALAUAGA ...