![ORTAL Clear 200 Скачать руководство пользователя страница 129](http://html1.mh-extra.com/html/ortal/clear-200/clear-200_installation-and-operation-manual_1654327129.webp)
129
Post-installation Procedures
The following sections present post-installation operations.
Initial Burning Period
Following installation of an ORTAL fireplace, there is a 12-hour minimum burning period. This 12-hour period
must include a minimum of 4 hours of continuous burning.
During this time, the customer/installer may notice:
x
The glass developing a white or “cloudy” film
x
An unusual smell
Both the film and the smell are due to the paint on the fireplace metal heating and “burning off”. This is normal.
The cloudiness and odor will disappear after the 12-hour period elapses and the installer returns to service the
fireplace and complete startup.
Final Inspection Procedure
When the 12-hour burning period is complete, the installer returns and performs the final inspection, which
includes:
1.
Cleaning the glass with a ceramic glass cleaner (otherwise the white film will remain)
2.
Checking the interior media
3.
Checking for gas leaks
4.
Performing an overall check to make sure that everything is working properly
When these activities are complete, initial startup is concluded and the fireplace may be operated by the owner.
Final Checks and Customer Instruction
Before releasing the unit to the customer for use without installer supervision, the installer must ensure that the
appliance is burning correctly. In addition, the installer must:
x
Review and explain unit operation to customer
x
Review and explain safety warnings to customer
x
Review and explain to the customer that glass is hot during and after operation
x
Review and explain maintenance requirements to the customer
x
Review and explain warranty requirements to the customer
x
Explain that if any questions or concerns arise, to contact the local ORTAL dealer/installer or ORTAL
directly for support.
Содержание Clear 200
Страница 1: ...Installation and Operation Manual AU NZ For 150 250 Units ORTAL Heating Systems Ltd ...
Страница 17: ...17 LEFT SIDE OPEN LS RIGHT SIDE OPEN RS THREE SIDES TS ...
Страница 21: ...21 Figure 3 Concrete Wall Mounting Detail ...
Страница 23: ...23 Figure 4 Wood Stud Mounting Detail ...
Страница 43: ...43 Figure 12 Exploded View of Pilot Parts Receiver and Gas Valve ...
Страница 55: ...55 Figure 12 Exploded View of Pilot Parts Receiver and Gas Valve ...
Страница 77: ...77 Flue Termination Drawings Flue Terminations ...
Страница 89: ...89 Pull the suction cup to take the glass out NOTE Repeat this process to remove the side glass ...
Страница 102: ...102 Pull the framed screen down and out and remove it ...
Страница 120: ...120 6 Push the right and left floor bricks into place as shown ...
Страница 125: ...125 ...
Страница 135: ...135 ORTAL Product Service Log ...
Страница 136: ...136 Manufacturer Contact Information For all service issues please contact your local dealer ...
Страница 146: ...146 Troubleshooting Beeping ...
Страница 147: ...147 ...
Страница 148: ...148 Mertix Maxitrol External Source Operation The following figure is taken from the Mertix Maxitrol guide ...
Страница 154: ...154 Pull the base until it releases Tilt the base as shown in the figure below ...
Страница 155: ...155 Pull the base out as shown ...
Страница 156: ... Ortal 2018 Rev 3 0 October 2018 KPMANUALAUAGA ...