
PAGE: 303
MAR 30/2020
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AF / AF-H / AF (6D)
© 2020 Orolia S.A.S. All rigths are strictly reserved.
B. RCP operational tests
Check correct operation of RCP LED and external buzzer by switching ELT and
RCP as described in the sequential procedure hereunder (with ELT switch in
the "ARM" position).
Figure 301: RCP LED and buzzer operation
IMPORTANT: (2) before switching the RCP to ON, wait for the end of the
self-test.
CAUTION: WHEN ACTIONING THE ARM/OFF/ON SWITCH, PULL LEVER
TO UNLOCK AND SET TO POSITION.
Содержание KANNAD 406 AF
Страница 59: ......