
PAGE: 302
MAR 30/2020
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AF / AF-H / AF (6D)
© 2020 Orolia S.A.S. All rigths are strictly reserved.
2. Operational and transmission tests
These tests are performed at first power up.
A. ELT operational tests
(1) Installation without programming dongle
• connect RCP to J1 and outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test result is OK (one long flash).
(2) Installation with programming dongle
• connect the outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test fails (3+4 flashes);
• if not, connect a maintenance dongle to J1:
- Switch the ELT from OFF to ARM;
- Check that the Self-Test fails (3+4 flashes);
- Remove the maintenance dongle from J1.
• connect the programming dongle to J1;
• switch the ELT from OFF to ARM:
the buzzer operates during the whole self-test procedure, after a few
seconds the LED displays the result.
• check that the Self-Test result is OK (one long flash).
CAUTION: WHEN ACTIONING THE ARM/OFF/ON SWITCH, PULL LEVER
TO UNLOCK AND SET TO POSITION.
Содержание KANNAD 406 AF
Страница 59: ......