IG-308-EN version 01; 03/06/2022
69
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
Maintenance
7.2. Acoustic earthing prevention alarm test
To test that the
ekor
.sas acoustic alarm is working correctly,
connect the
ekor
.vpis voltage presence indicating relay
at 230 V
ac
with 4 mm cable connectors, which are placed
in the indicating relay between the earth test point and
the test point for phase L1. Maintain the auxiliary power
for 5 minutes, after which time the lever is inserted in the
earthing switch shaft in order to carry out the operation.
The alarm starts to sound and continues to sound for at
least 30 seconds. It will stop when the lever is removed.
The
ekor
.sas alarm can be replaced if necessary, since it
is joined to the associated units with two friction-fit PCB
connectors:
• One three-pin connector, polarised for the voltage
presence indicating relay.
• One two-pin connector for the lever microswitch.
The procedure is as follows:
1.
Remove the driving mechanism cover.
a.
Unscrew the
ekor
.sas unit to extract it.
b.
Undo both connectors and replace the current
unit; then connect it to the lever microswitch
(2-pin connector) and the voltage indicator
(polarised 3-pin connector).
Figure 7.2.
Detail of
ekor
.sas device
2. ekor
.sas connections.
Figure 7.3.
Connection detail of
ekor
.sas device